A3H145-FR09-11A4K-10 YUKEN variable piston pump
YUKEN piston pump series: A series, AR series, ARL1 series, A3H series, A3HG series, A7H series.
Whats app: +86 13728707767
E-mail: hyd-sales2009@outlook.com
We are a professional manufacturer of hydraulic pumps, offering a complete range of products. Inquiries are welcome! (#^.^#)
Parameter Description of YUKEN High-Pressure Variable Displacement Piston Pump A3H145-FR09-11A4K-10
1. Model Interpretation
-
A3H: Series identifier, indicating the A3H series high-pressure variable displacement piston pump.
-
145: Displacement code, corresponding to a theoretical displacement of 145.2 cm³/rev.
-
F: Mounting type, representing flange mounting (F = Flange mounting; L = Foot mounting is an alternative).
-
R: Rotation direction, meaning clockwise rotation when viewed from the shaft extension end (standard configuration).
-
09: Control type, indicating constant power (torque) control mode.
-
11: Input power setting, corresponding to 11kW.
-
A: Power frequency, representing 50Hz (A = 50Hz; B = 60Hz is an alternative).
-
4: Motor pole number, indicating 4-pole motor.
-
K: Shaft extension shape, representing keyed shaft (parallel key type).
-
10: Design number, indicating the standard design version.
2. Core Performance Parameters
|
Parameter Item
|
Specification
|
Remarks
|
|---|---|---|
|
Theoretical Displacement
|
145.2 cm³/rev
|
Standard configuration for A3H145 series
|
|
Maximum Rotational Speed
|
1800 r/min
|
Applicable when suction port pressure is 0 kPa; adjust to 0~+0.5 kgf/cm² if speed exceeds 1800 r/min
|
|
Adjustment Pressure
|
63 kgf/cm²
|
Clockwise rotation of the adjustment screw increases pressure
|
|
Suction Pressure Range
|
-0.16 ~ +0.5 kgf/cm² (-127 mmHg ~ +0.5 kgf/cm²)
|
Ensure stable suction to avoid cavitation
|
|
Housing Pressure
|
Normal pressure ≤ 1 kgf/cm²; Surge pressure ≤ 5 kgf/cm²
|
Guaranteed by proper drain piping installation
|
|
Recommended Hydraulic Oil
|
Petroleum-based anti-wear hydraulic oil or R&O (rust and oxidation inhibitor) hydraulic oil (ISO VG 32 or 46)
|
Viscosity range: 20~400 cst at 0~60℃
|
|
Oil Contamination Control
|
NAS Grade 10 or higher
|
Suction port: ≥100 µm (150 mesh) reservoir filter; Return line: ≤10 µm line filter
|
3. Installation & Piping Requirements
-
Mounting: The filling port should be positioned upwards; use a flexible coupling to avoid bending or thrust stress. Maximum permissible misalignment is less than 0.1 mm TIR, and maximum permissible misangularity is less than 0.2°.
-
Suction Piping: Use 3/4″ pipes with an inner diameter of 19 mm or more; the height of the pump suction port should be within 1 meter from the oil level in the reservoir. Avoid excessive load from steel pipes; use rubber hoses if necessary.
-
Drain Piping: Use 3/4″ pipes with an inner diameter of 19 mm or more; piping length should be less than 1 m, and the pipe end should be submerged in oil to maintain stable housing pressure.
-
Safety Protection: Install a relief valve in the circuit to eliminate surge pressure damage when the delivery line is suddenly blocked; bleed air from the pump case and outlet line before startup to avoid vibration.
4. Pre-Delivery & Maintenance Notes
-
Pre-Delivery Setting: The pump is preset to maximum delivery and minimum discharge pressure before despatch; adjust according to actual system requirements.
-
Startup Preparation: Fill the pump case with clean hydraulic oil through the fill port before starting to ensure lubrication.
-
Maintenance: Regularly check oil contamination degree, filter condition and piping tightness to extend the pump service life.

yuken Variable Displacement Piston Pumps
| A10-F-R-01-B-K-32 A10-FR07CS-12 A10-LR09DS-60 A100-FR01BS-60 A100-FR07CS-12 A100-LR09DS-60 A145-F-R-05EH-60 A145-FR01CK-32 A145-FR04BK-32 A145-LR01AS-60 A16-F-R-01-C-K-32 A16-FR01CK-32 A16-FR04BK-32 A16-LR01AS-60 A22-F-R-01-B-K-32 A22-FR01BS-60 A22-FR07CS-12 A22-LR09DS-60 A37-F-R-01-C-K-32 A37-FR01CK-32 A37-FR04BK-32 A37-LR01AS-60 A45-FR01BS-60 A45-FR07CS-12 A45-LR09DS-60 |
A56-FR01CK-32 A56-FR04BK-32 A56-LR01AS-60 A70-FR01BS-60 A70-FR07CS-12 A70-LR09DS-60 A90-FR01CK-32 A90-FR04BK-32 A90-LR01AS-60 AR16-FR01C-12 AR16-FR01C-22 AR16-FR01D-12 AR16-FR07C-22 AR16-LR01C-22 AR16-LR09C-22 AR22-FR01C-12 AR22-FR01C-22 AR22-FR01D-12 AR22-FR04C-22 AR22-LR01C-22 AR22-LR04C-22 AR37-FR01C-22 AR37-FR07C-22 AR37-LR01C-22 AR37-LR07C-22 |
ARL1-16-FR01C-22 ARL1-16-FR04C-22 ARL1-16-LR01C-22 ARL1-16-LR04C-22 ARL1-22-FR01C-22 ARL1-22-FR07C-22 ARL1-22-LR01C-22 ARL1-22-LR07C-22 ARL1-8-F-R-01-C-K-10 A7H180-FR01KK-10 A7H180-FR07KK-10 A7H180-FR09-11A4K-10 A7H180-LR01KK-10 A7H180-LR07KK-10 A3H100-FR01-11A4K-10 A3H100-FR07-11A4K-10 A3H100-FR09-11A4K-10 A3H116-FR01KK-10 A3H116-FR07KK-10 A3H145-FR01-11A4K-10 A3H145-FR01KK-10 A3H145-FR04KK-10 A3H145-FR07-11A4K-10 A3H145-FR09-11A4K-10 A3H16-FR01-11A4K-10 |
A3H16-FR01KK-10 A3H16-FR07-11A4K-10 A3H16-FR09-11A4K-10 A3H16-FR14KK-10 A3H16-LR01KK-10 A3H180-FR01-11A4K-10 A3H180-FR01KK-10 A3H180-FR07-11A4K-10 A3H180-FR07KK-10 A3H180-FR09-11A4K-10 A3H37-FR01-11A4K-10 A3H37-FR01KK-10 A3H37-FR07-11A4K-10 A3H37-FR07KK-10 A3H37-FR09-11A4K-10 A3H37-LR01KK-10 A3H56-FR01-11A4K-10 A3H56-FR01KK-10 A3H56-FR04KK-10 A3H56-FR07-11A4K-10 A3H56-FR09-11A4K-10 A3H56-LR01KK-10 A3H71-FR01-11A4K-10 A3H71-FR01KK-10 A3H71-FR07-11A4K-10 |
A3H71-FR07KK-10 A3H71-LR01KK-10 A3H90-FR01KK-10 A3H90-FR04KK-10 A3HG16-FR01KK-10 A3HG37-FR01KK-10 A3HG56-FR01KK-10 A3HG71-FR01KK-E1C-10 A3HG71-FR01KK-E1D-10 A3HG71-FR01KK-J1C-10 A3HG71-FR01KK-J1D-10 A3HG71-FR01KK-U1C-10 A3HG71-FR01KK-U1D-10 A3HG71-FR07KK-E1C-10 A3HG71-FR07KK-E1D-10 A3HG71-FR07KK-J1C-10 A3HG71-FR07KK-J1D-10 A3HG71-FR07KSP-E1C-10 A3HG71-FR07KSP-E1D-10 A3HG71-FR14KK-E1C-10 A3HG71-FR14KK-E1D-10 A3HG71-FR14KK-J1C-10 A3HG71-FR14KK-J1D-10 A3HG71-FR14KSP-E1C-10 A3HG71-FR14KSP-E1D-10 |
Process steps:
Customer inquiry: Customers will make inquiries before placing an order to understand product details and communication needs.
Quotation: According to customer needs, provide a formal quotation, including the name, model, quantity, delivery time, payment method, etc. of the goods.
Order confirmation: After the customer confirms the quotation, a formal purchase order will be placed.
Confirm the delivery time: communicate the delivery time with the production department, inform the factory of the order details, and arrange the production plan.
Sign an export contract: After the two parties confirm that it is correct, sign an export contract to establish a trade relationship.
Implement the letter of credit (if applicable): If the payment method of the letter of credit is used, the customer needs to be urged to issue the certificate and review the contents of the letter of credit.
Export stocking: According to the requirements of the contract and the letter of credit, arrange production, purchase raw materials and packaging, and prepare the goods.
Chartering and booking: Contact the freight forwarder to make a booking and arrange the transportation of goods.
Export inspection: Apply to the quality inspection department for export commodity inspection and provide relevant documents.
Apply for a write-off slip: apply for a write-off slip from the foreign exchange management department for subsequent foreign exchange write-off.
Export declaration: Declare exports to the customs and provide documents such as power of attorney for customs declaration, customs declaration form for export goods, commercial invoice, packing list, etc.
