YUKEN A3HG16 High‑Pressure Variable Displacement Piston Pump
Model Numbers:
A3HG16、A3HG37、A3HG56、A3HG71、A3HG100、A3HG145、A3HG180
Whats app: +86 13728707767
E-mail: hyd-sales2009@outlook.com
1. General Description
The A3HG16 is an axial piston pump with swashplate design, belonging to YUKEN A3HG series. It is upgraded from the A3H series and complies with ISO 3019‑1 / ISO 3019‑2 international mounting standards. Standard built‑in through drive allows tandem mounting of a second pump on the rear side.
- Geometric displacement: 16.3 cm³/rev
- Minimum adjustable displacement: 8.0 cm³/rev
- Rated continuous pressure: 31.5 MPa
- Intermittent peak pressure: 35 MPa (short‑term shock only, not for continuous operation)
2. Main Features
- International ISO mounting standard, easy direct replacement for global equivalent pumps.
- Through‑drive shaft supplied as standard for multi‑pump tandem configuration.
- Four optional control types for different hydraulic system requirements.
- High volumetric efficiency, low noise and stable performance under continuous heavy load.
- Keyed shaft or splined shaft available; metric / SAE port flange options.
- Standard FKM fluorocarbon seals for mineral hydraulic oil; special seal kits for fire‑resistant fluids on request.
3. Applications
Injection moulding machines, hydraulic presses, machine tools, hydraulic power units, packaging machinery, material handling equipment and other industrial hydraulic systems requiring stable pressure control or energy‑saving load‑sensing control.
4. Model Code Explanation
A3HG16‑[F/L][R/L][01/07/09/14][K][E1/E2/U1/U2]‑10
- A3HG = Series code
- 16 = Size code (16.3 cm³/rev)
- F = Flange mounting; L = Foot mounting
- R = Clockwise rotation (viewed from shaft end); L = Counter‑clockwise rotation
- 01 = Pressure compensator
- 07 = External pilot pressure compensator
- 09 = External pilot constant power control
- 14 = Load sensing (LS) control
- K = Shaft style (keyed / splined)
- E1/E2/U1/U2 = Port flange standard (ISO / SAE / BSPP)
- 10 = Design revision
5. Technical Specifications (A3HG16)
| Item | Specification |
|---|---|
| Geometric displacement | 16.3 cm³/rev |
| Min. adjustable displacement | 8.0 cm³/rev |
| Rated pressure | 31.5 MPa |
| Intermittent max pressure | 35 MPa |
| Speed range | 600 ~ 3600 r/min |
| Recommended hydraulic fluid | Anti‑wear mineral hydraulic oil ISO VG32 / VG46 |
| Operating viscosity range | 20 ~ 200 mm²/s |
| Fluid temperature range | -10 ~ +80 ℃ |
| Recommended fluid cleanliness | ISO 4406 18/15 or better |
| Suction pressure | -16.7 ~ +50 kPa (600–1800 rpm); 0 ~ +50 kPa (>1800 rpm, no vacuum allowed) |
| Case drain allowable pressure | Normal ≤0.1 MPa; transient peak ≤0.5 MPa |
| Approx. weight (flange mount) | 17 kg |
| Approx. weight (foot mount) | 21 kg |
6. Control Types
- 01 Pressure compensator Most common version. Maintains set system pressure. Pump reduces displacement automatically once target pressure is reached to save energy. Suitable for presses and injection machines.
- 07 External pilot pressure compensator Remote pressure adjustment via external pilot valve, for multi‑step pressure control.
- 09 External pilot constant power control Limits input power of the drive motor. Pump reduces flow automatically when pressure rises to avoid motor overload. Power curve can be remotely adjusted.
- 14 Load Sensing (LS) Pump delivers only the flow demanded by actuators. Reduces heat generation and power loss, ideal for systems with variable flow demand and multiple actuators.
7. Fluid Requirements
- Standard FKM seals are only compatible with petroleum‑based hydraulic oil.
- For water‑glycol, phosphate ester or other fire‑resistant fluids, a special seal kit must be ordered separately.
- Install filters on suction and pressure lines to maintain fluid cleanliness.
8. Mounting Instructions
- Install the pump horizontally with the fill port upward. Use flexible coupling. Total indicator runout ≤0.1 mm, angular misalignment ≤0.2°.
- Keep suction piping short, large bore and free of air pockets. Air ingestion will cause cavitation and damage.
- Case drain line must be submerged in oil, pipe length less than 1 m.
- Fill pump housing with hydraulic oil before initial start‑up for lubrication.
- When tandem mounting via through drive, the secondary pump displacement must not exceed the allowable limit of the through shaft.
9. Start‑up & Adjustment
- First run with no load. Check abnormal noise, vibration and leakage.
- Turn adjustment screw clockwise to increase pressure / power setting. Tighten lock nut after setting.
- Increase pressure and load gradually, monitor oil temperature, suction pressure and noise level.
- For LS control (code 14), the LS signal line must be routed correctly, otherwise the pump cannot function normally.
10. Maintenance
- Periodically check oil level, colour and contamination.
- Replace hydraulic oil and filters according to maintenance schedule.
- Inspect seals for external leakage; replace seal kit if leakage is excessive.
- Avoid continuous cavitation, air ingestion and operation with contaminated oil.
11. Safety Precautions
- All adjustment, disassembly and service work must be performed after full system pressure relief and power cut‑off.
- Do not exceed 35 MPa peak pressure.
- Never start the pump without hydraulic oil; dry running causes immediate internal damage.
- Pump housing and piping can reach high temperature during operation; avoid direct contact.
12. Troubleshooting
| Symptom | Possible Cause |
|---|---|
| Loud noise, knocking, cavitation | Low oil level, clogged suction filter, excessive viscosity, air entering suction line |
| No pressure build‑up | Incorrect regulator setting, internal wear, damaged seals |
| Excessive oil overheating | Overload, insufficient cooling, contaminated oil, high case drain pressure |
| External leakage | Worn or damaged seal rings, housing surface defects |
13. Example Model
Flange mount, clockwise rotation, pressure compensator 01, keyed shaft, E2 port flange, revision 10 A3HG16‑FR01K‑E2‑10
Process steps:
Customer inquiry: Customers will make inquiries before placing an order to understand product details and communication needs.
Quotation: According to customer needs, provide a formal quotation, including the name, model, quantity, delivery time, payment method, etc. of the goods.
Order confirmation: After the customer confirms the quotation, a formal purchase order will be placed.
Confirm the delivery time: communicate the delivery time with the production department, inform the factory of the order details, and arrange the production plan.
Sign an export contract: After the two parties confirm that it is correct, sign an export contract to establish a trade relationship.
Implement the letter of credit (if applicable): If the payment method of the letter of credit is used, the customer needs to be urged to issue the certificate and review the contents of the letter of credit.
Export stocking: According to the requirements of the contract and the letter of credit, arrange production, purchase raw materials and packaging, and prepare the goods.
Chartering and booking: Contact the freight forwarder to make a booking and arrange the transportation of goods.
Export inspection: Apply to the quality inspection department for export commodity inspection and provide relevant documents.
Apply for a write-off slip: apply for a write-off slip from the foreign exchange management department for subsequent foreign exchange write-off.
Export declaration: Declare exports to the customs and provide documents such as power of attorney for customs declaration, customs declaration form for export goods, commercial invoice, packing list, etc.
