Home » Product » F11-012 series Parker hydraulic motor

F11-012 series Parker hydraulic motor

F11-005、 F11-006、 F11-010、 F11-012、 F11-014、 F11-019、 F11-150、 F11-250、 F12-30、 F12-40、 F12-60、 F12-80、 F12-90、 F12-110、 F12-125、 F12-152、 F12-162、 F12-182、 F12-250

                  E-mail: hyd-sales2009@outlook.com

Description

F11 series hydraulic motors:  displacement range from 5cc to 250cc, specific specifications include 5cc, 6cc, 10cc, 12cc, 14cc, 19cc, 150cc, 250cc, etc.
F12 series hydraulic motors:  displacement range from 30cc to 250cc, specific specifications include 30cc, 40cc, 60cc, 80cc, 90cc, 110cc, 125cc, 152cc, 162cc, 182cc, 250cc, etc.

Core specifications and technical characteristics of Parker F11-012 series hydraulic motors:
Key performance parameters
Displacement: 12 cm3/rev (cubic centimeters/revolution)
Pressure level:
Continuous working pressure: 350 bar (5,075 psi)
Maximum intermittent pressure: 420 bar (6,090 psi)
Speed range:
Maximum speed: 14,000 rpm (ideal operating conditions)
Rotation direction: double rotation design (support forward and reverse rotation)
Mounting flange: compatible with CETOP/ISO/SAW/SAE standard interface
Core technical advantages
High-strength structure:
Ball plunger design + laminated piston ring, strong thermal shock resistance
Time-sharing gear drive mechanism, synchronous drive shaft and cylinder block rotation, withstand high pressure and torsional vibration
High efficiency and low noise:
40° shaft-cylinder angle design to reduce operating noise
Volumetric efficiency>95%, reducing energy loss
Compact design:
The rotating parts are lightweight and 30% smaller than traditional motors

Typical application scenarios
Construction machinery walking drive system
High-precision plastic injection molding equipment
Ship deck mechanical hydraulic power unit
Rotary mechanism of mine drilling equipment
Suggest the next step: if you need a specific model (such as F11-012-MB-CV-K-000-0000-0 ) For the installation size diagram or hydraulic circuit integration plan, please provide the complete model, and I will synchronize the flange interface size and electrical adaptation parameters..

F11-005-GB-CV-K-000-0000
F11-005-HB-CV-K-000-000
F11-005-MB-CV-K-000-0000
F11-005-RB-CV-D-000-0000
F11-006-MB-CV-K-000-0000
F11-006-MB-IV-K-000-000
F11-010-HU-CV-K-000-0000
F11-010-MB-CV-K-000-0000
F11-010-RB-CV-K-000-0000
F11-012-QU-CV-K-000-000
F11-012-RB-CV-K-000-0000
F11-014-HB-CV-K-000-000
F11-014-LU-SV-S-000-0000
F11-014-SF-IV-K-000-0000
F11-019-HB-CV-D-000-0000
F11-019-MB-CN-K-000-0000
F11-019-MB-CV-K-000-0000
F11-019-RB-CV-K-000-0000
F12-030-LF-IV-K-000-000
F12-030-LF-IV-P-000-000
F12-030-LS-SV-S-000-000
F12-030-LS-SV-T-000-000
F12-030-LS-TV-P-000-000
F12-030-LS-TV-S-000-000
F12-030-LS-TV-T-000-000
F12-030-MF-IV-P-000-000
F12-030-RS-SV-S-000-000
F12-030-RS-TV-S-000-000
F12-030-RS-TV-T-000-000
F12-030-SF-IS-P-000-000
F12-040-MF-IV-D-000-0000
F12-040-MF-IV-K-000-000
F12-040-MF-IV-K-000-0000
F12-040-MS-SN-T-000-000
F12-040-MS-SV-S-000-0000
F12-040-MS-SV-T-000-000
F12-040-MS-SV-T-000-0000
F12-040-MS-TV-T-000-000
F12-040-RF-IV-K-000-0000
F12-060-MF-IV-D-000-0000
F12-060-MF-IV-K-000-0000
F12-060-MS-SV-S-000-0000
F12-060-MS-SV-T-000-0000
F12-060-RF-IV-K-000-0000
F12-060-RS-SV-T-000-0000
F12-080-LF-IV-K-000-0000
F12-080-MF-IV-D-000-0000
F12-080-MF-IV-K-000-0000
F12-080-MS-SV-T-000-0000
F12-080-RF-IV-K-000-0000
F12-080-RS-SV-T-000-0000
F12-090-MF-IV-D-000-0000
F12-090-MS-SV-S-000-0000
F12-110-MF-IV-K-000-0000
F12-110-MS-SV-S-000-0000
F12-110-RF-IV-K-000-0000
F12-110-RS-SV-T-000-0000
F12-125-RF-IV-K-000-0000
F12-152-MF-FV-G-000-0000
F12-152-MF-SV-S-000-0000
Shipping & Delivery

Process steps:
Customer inquiry: Customers will make inquiries before placing an order to understand product details and communication needs.
Quotation: According to customer needs, provide a formal quotation, including the name, model, quantity, delivery time, payment method, etc. of the goods.
Order confirmation: After the customer confirms the quotation, a formal purchase order will be placed.
Confirm the delivery time: communicate the delivery time with the production department, inform the factory of the order details, and arrange the production plan.
Sign an export contract: After the two parties confirm that it is correct, sign an export contract to establish a trade relationship.
Implement the letter of credit (if applicable): If the payment method of the letter of credit is used, the customer needs to be urged to issue the certificate and review the contents of the letter of credit.
Export stocking: According to the requirements of the contract and the letter of credit, arrange production, purchase raw materials and packaging, and prepare the goods.
Chartering and booking: Contact the freight forwarder to make a booking and arrange the transportation of goods.
Export inspection: Apply to the quality inspection department for export commodity inspection and provide relevant documents.
Apply for a write-off slip: apply for a write-off slip from the foreign exchange management department for subsequent foreign exchange write-off.
Export declaration: Declare exports to the customs and provide documents such as power of attorney for customs declaration, customs declaration form for export goods, commercial invoice, packing list, etc.