Home » Product » F11-014 series Parker hydraulic motor

F11-014 series Parker hydraulic motor

F11-005、 F11-006、 F11-010、 F11-012、 F11-014、 F11-019、 F11-150、 F11-250、 F12-30、 F12-40、 F12-60、 F12-80、 F12-90、 F12-110、 F12-125、 F12-152、 F12-162、 F12-182、 F12-250

                  E-mail: hyd-sales2009@outlook.com

Description

F11 series hydraulic motors:  displacement range from 5cc to 250cc, specific specifications include 5cc, 6cc, 10cc, 12cc, 14cc, 19cc, 150cc, 250cc, etc.
F12 series hydraulic motors:  displacement range from 30cc to 250cc, specific specifications include 30cc, 40cc, 60cc, 80cc, 90cc, 110cc, 125cc, 152cc, 162cc, 182cc, 250cc, etc.

Parker F11-014 series hydraulic motor core specifications
Basic technical parameters
Displacement: 14 cm3/rev (cubic centimeters/revolution)
Pressure level:
Maximum intermittent working pressure: 420 bar
Continuous working pressure: 350 bar
Maximum speed: up to 14,000 rpm
Installation form: compatible with CETOP, ISO, SAW and SAE standard flanges
Rotation direction: double rotation design (support forward and reverse rotation)
Model and configuration

Examples of common models:
F11-014-HB-CV-K-000-000-0‌‌
F11-014-HF-IV-K-000-000-0‌‌
Design and performance characteristics
High power density:
The rotating parts are lightweight in design, compact in structure, and adapt to high-speed working conditions.
Strong impact resistance:
The laminated piston ring structure improves the thermal shock resistance and life.
Low noise operation:
Optimize the design of the distribution disc to reduce pressure pulsation.

Typical application areas
Construction machinery walking drive system
Hydraulic power unit of plastic injection molding machine
Ship deck machinery, mining equipment

Next suggestion: If you need a specific model of installation size diagram or hydraulic circuit integration plan, provide a complete model (such as F11-014-HB-CV-K).-000-000-0 ), I can further provide the flange interface details and adaptation parameters..

F11-005-GB-CV-K-000-0000
F11-005-HB-CV-K-000-000
F11-005-MB-CV-K-000-0000
F11-005-RB-CV-D-000-0000
F11-006-MB-CV-K-000-0000
F11-006-MB-IV-K-000-000
F11-010-HU-CV-K-000-0000
F11-010-MB-CV-K-000-0000
F11-010-RB-CV-K-000-0000
F11-012-QU-CV-K-000-000
F11-012-RB-CV-K-000-0000
F11-014-HB-CV-K-000-000
F11-014-LU-SV-S-000-0000
F11-014-SF-IV-K-000-0000
F11-019-HB-CV-D-000-0000
F11-019-MB-CN-K-000-0000
F11-019-MB-CV-K-000-0000
F11-019-RB-CV-K-000-0000
F12-030-LF-IV-K-000-000
F12-030-LF-IV-P-000-000
F12-030-LS-SV-S-000-000
F12-030-LS-SV-T-000-000
F12-030-LS-TV-P-000-000
F12-030-LS-TV-S-000-000
F12-030-LS-TV-T-000-000
F12-030-MF-IV-P-000-000
F12-030-RS-SV-S-000-000
F12-030-RS-TV-S-000-000
F12-030-RS-TV-T-000-000
F12-030-SF-IS-P-000-000
F12-040-MF-IV-D-000-0000
F12-040-MF-IV-K-000-000
F12-040-MF-IV-K-000-0000
F12-040-MS-SN-T-000-000
F12-040-MS-SV-S-000-0000
F12-040-MS-SV-T-000-000
F12-040-MS-SV-T-000-0000
F12-040-MS-TV-T-000-000
F12-040-RF-IV-K-000-0000
F12-060-MF-IV-D-000-0000
F12-060-MF-IV-K-000-0000
F12-060-MS-SV-S-000-0000
F12-060-MS-SV-T-000-0000
F12-060-RF-IV-K-000-0000
F12-060-RS-SV-T-000-0000
F12-080-LF-IV-K-000-0000
F12-080-MF-IV-D-000-0000
F12-080-MF-IV-K-000-0000
F12-080-MS-SV-T-000-0000
F12-080-RF-IV-K-000-0000
F12-080-RS-SV-T-000-0000
F12-090-MF-IV-D-000-0000
F12-090-MS-SV-S-000-0000
F12-110-MF-IV-K-000-0000
F12-110-MS-SV-S-000-0000
F12-110-RF-IV-K-000-0000
F12-110-RS-SV-T-000-0000
F12-125-RF-IV-K-000-0000
F12-152-MF-FV-G-000-0000
F12-152-MF-SV-S-000-0000
Shipping & Delivery

Process steps:
Customer inquiry: Customers will make inquiries before placing an order to understand product details and communication needs.
Quotation: According to customer needs, provide a formal quotation, including the name, model, quantity, delivery time, payment method, etc. of the goods.
Order confirmation: After the customer confirms the quotation, a formal purchase order will be placed.
Confirm the delivery time: communicate the delivery time with the production department, inform the factory of the order details, and arrange the production plan.
Sign an export contract: After the two parties confirm that it is correct, sign an export contract to establish a trade relationship.
Implement the letter of credit (if applicable): If the payment method of the letter of credit is used, the customer needs to be urged to issue the certificate and review the contents of the letter of credit.
Export stocking: According to the requirements of the contract and the letter of credit, arrange production, purchase raw materials and packaging, and prepare the goods.
Chartering and booking: Contact the freight forwarder to make a booking and arrange the transportation of goods.
Export inspection: Apply to the quality inspection department for export commodity inspection and provide relevant documents.
Apply for a write-off slip: apply for a write-off slip from the foreign exchange management department for subsequent foreign exchange write-off.
Export declaration: Declare exports to the customs and provide documents such as power of attorney for customs declaration, customs declaration form for export goods, commercial invoice, packing list, etc.