F11-019 series Parker hydraulic motor
F11-005、 F11-006、 F11-010、 F11-012、 F11-014、 F11-019、 F11-150、 F11-250、 F12-30、 F12-40、 F12-60、 F12-80、 F12-90、 F12-110、 F12-125、 F12-152、 F12-162、 F12-182、 F12-250
E-mail: hyd-sales2009@outlook.com
F11 series hydraulic motors: displacement range from 5cc to 250cc, specific specifications include 5cc, 6cc, 10cc, 12cc, 14cc, 19cc, 150cc, 250cc, etc.
F12 series hydraulic motors: displacement range from 30cc to 250cc, specific specifications include 30cc, 40cc, 60cc, 80cc, 90cc, 110cc, 125cc, 152cc, 162cc, 182cc, 250cc, etc.

Parker F11-019 series hydraulic motor specifications
Overview of core parameters
Displacement: 19 cm3/rev
Pressure level:
Maximum intermittent working pressure: 420 bar
Continuous working pressure: 350 bar
Maximum speed: 14,000 rpm
Installation form: compatible with CETOP, ISO, SAW and SAE standard flanges
Rotation direction: double rotation design (support forward and reverse rotation)
Model and configuration example
F11-019-MB-CV-K-000-000-0 , F11-019-MU-SV-S-000-0000-00
Technical features
Compact structure:
The shaft and the cylinder block are at an angle of 40°, which is small in size and light in weight.
High reliability:
Ball plug design + laminated piston ring, strong thermal shock resistance.
Low leakage design: optimize the sealing structure to reduce internal leakage.
Typical application areas
Construction machinery walking drive system
Hydraulic unit of plastic injection molding machine
Ship deck machinery, mining equipment
Next suggestion: If you need a specific model of installation size or hydraulic circuit adaptation plan, provide a complete model (such as F11-019-MB-CV-K).-000-000-0 ), I can further provide detailed interface parameters and configuration suggestions..
| F11-005-GB-CV-K-000-0000 F11-005-HB-CV-K-000-000 F11-005-MB-CV-K-000-0000 F11-005-RB-CV-D-000-0000 F11-006-MB-CV-K-000-0000 F11-006-MB-IV-K-000-000 F11-010-HU-CV-K-000-0000 F11-010-MB-CV-K-000-0000 F11-010-RB-CV-K-000-0000 F11-012-QU-CV-K-000-000 F11-012-RB-CV-K-000-0000 F11-014-HB-CV-K-000-000 F11-014-LU-SV-S-000-0000 F11-014-SF-IV-K-000-0000 F11-019-HB-CV-D-000-0000 |
F11-019-MB-CN-K-000-0000 F11-019-MB-CV-K-000-0000 F11-019-RB-CV-K-000-0000 F12-030-LF-IV-K-000-000 F12-030-LF-IV-P-000-000 F12-030-LS-SV-S-000-000 F12-030-LS-SV-T-000-000 F12-030-LS-TV-P-000-000 F12-030-LS-TV-S-000-000 F12-030-LS-TV-T-000-000 F12-030-MF-IV-P-000-000 F12-030-RS-SV-S-000-000 F12-030-RS-TV-S-000-000 F12-030-RS-TV-T-000-000 F12-030-SF-IS-P-000-000 |
F12-040-MF-IV-D-000-0000 F12-040-MF-IV-K-000-000 F12-040-MF-IV-K-000-0000 F12-040-MS-SN-T-000-000 F12-040-MS-SV-S-000-0000 F12-040-MS-SV-T-000-000 F12-040-MS-SV-T-000-0000 F12-040-MS-TV-T-000-000 F12-040-RF-IV-K-000-0000 F12-060-MF-IV-D-000-0000 F12-060-MF-IV-K-000-0000 F12-060-MS-SV-S-000-0000 F12-060-MS-SV-T-000-0000 F12-060-RF-IV-K-000-0000 F12-060-RS-SV-T-000-0000 |
F12-080-LF-IV-K-000-0000 F12-080-MF-IV-D-000-0000 F12-080-MF-IV-K-000-0000 F12-080-MS-SV-T-000-0000 F12-080-RF-IV-K-000-0000 F12-080-RS-SV-T-000-0000 F12-090-MF-IV-D-000-0000 F12-090-MS-SV-S-000-0000 F12-110-MF-IV-K-000-0000 F12-110-MS-SV-S-000-0000 F12-110-RF-IV-K-000-0000 F12-110-RS-SV-T-000-0000 F12-125-RF-IV-K-000-0000 F12-152-MF-FV-G-000-0000 F12-152-MF-SV-S-000-0000 |
Process steps:
Customer inquiry: Customers will make inquiries before placing an order to understand product details and communication needs.
Quotation: According to customer needs, provide a formal quotation, including the name, model, quantity, delivery time, payment method, etc. of the goods.
Order confirmation: After the customer confirms the quotation, a formal purchase order will be placed.
Confirm the delivery time: communicate the delivery time with the production department, inform the factory of the order details, and arrange the production plan.
Sign an export contract: After the two parties confirm that it is correct, sign an export contract to establish a trade relationship.
Implement the letter of credit (if applicable): If the payment method of the letter of credit is used, the customer needs to be urged to issue the certificate and review the contents of the letter of credit.
Export stocking: According to the requirements of the contract and the letter of credit, arrange production, purchase raw materials and packaging, and prepare the goods.
Chartering and booking: Contact the freight forwarder to make a booking and arrange the transportation of goods.
Export inspection: Apply to the quality inspection department for export commodity inspection and provide relevant documents.
Apply for a write-off slip: apply for a write-off slip from the foreign exchange management department for subsequent foreign exchange write-off.
Export declaration: Declare exports to the customs and provide documents such as power of attorney for customs declaration, customs declaration form for export goods, commercial invoice, packing list, etc.
