F11-025 series Parker hydraulic motor
F11-005、 F11-006、 F11-010、 F11-012、 F11-014、 F11-019、 F11-150、 F11-250、 F12-30、 F12-40、 F12-60、 F12-80、 F12-90、 F12-110、 F12-125、 F12-152、 F12-162、 F12-182、 F12-250
E-mail: hyd-sales2009@outlook.com
Specifications of Parker Hydraulic Motor F11-025 Series
|
Specification Item
|
Parameter Value
|
Remarks
|
|
Model
|
F11-025 Series
|
Fixed displacement, bent-axis type
|
|
Displacement
|
25 cm³/rev (25 ml/r)
|
Nominal displacement
|
|
Operating Pressure
|
Peak: 420 bar (6090 psi); Continuous: 350 bar (5076 psi)
|
Intermittent pressure: max 6 seconds in any one minute
|
|
Operating Speed
|
Max Intermittent: 3000 rpm; Max Continuous: 2600 rpm; Min Continuous: 50 rpm
|
–
|
|
Self-priming Speed
|
1700 rpm
|
Valid at sea level
|
|
Torque
|
40 Nm (at 10 MPa)
|
Calculated based on basic hydraulic motor formula
|
|
Flow Rate
|
Max Intermittent: 75 L/min; Max Continuous: 65 L/min
|
Calculated by displacement and speed
|
|
Operating Temperature Range
|
Min: -40 °C; Max: 80 °C
|
Main circuit temperature limit
|
|
Rotation Direction
|
Left (L) or Right (R) operation
|
Selectable according to application needs
|
|
Weight
|
19 kg
|
Approximate weight without additional accessories
|
|
Mounting Flange
|
CETOP and SAE versions available
|
SAE ‘D’ (SAE J 744 C) mounting flange for SAE version
|
|
Screw Tightening Torque
|
80 ± 15 Nm
|
Applicable to F11-025 series
|
|
Shaft Type
|
Spline shaft (DIN 5480) available
|
Specific dimensions refer to installation drawings
|
Key Features
-
Bent-axis design with 40° angle between shaft and cylinder barrel, ensuring compact structure and light weight, suitable for small installation spaces.
-
High intermittent and continuous operating pressure, enabling stable output power in small to medium-sized equipment.
-
Laminated piston ring design reduces internal leakage and improves thermal shock resistance, ensuring long-term reliable operation.
-
Reliable structure with timing gear and bearing setup, ensuring long service life and strong vibration resistance in harsh working environments.

| F11-005-GB-CV-K-000-0000 F11-005-HB-CV-K-000-000 F11-005-MB-CV-K-000-0000 F11-005-RB-CV-D-000-0000 F11-006-MB-CV-K-000-0000 F11-006-MB-IV-K-000-000 F11-010-HU-CV-K-000-0000 F11-010-MB-CV-K-000-0000 F11-010-RB-CV-K-000-0000 F11-012-QU-CV-K-000-000 F11-012-RB-CV-K-000-0000 F11-014-HB-CV-K-000-000 F11-014-LU-SV-S-000-0000 F11-014-SF-IV-K-000-0000 F11-019-HB-CV-D-000-0000 |
F11-019-MB-CN-K-000-0000 F11-019-MB-CV-K-000-0000 F11-019-RB-CV-K-000-0000 F12-030-LF-IV-K-000-000 F12-030-LF-IV-P-000-000 F12-030-LS-SV-S-000-000 F12-030-LS-SV-T-000-000 F12-030-LS-TV-P-000-000 F12-030-LS-TV-S-000-000 F12-030-LS-TV-T-000-000 F12-030-MF-IV-P-000-000 F12-030-RS-SV-S-000-000 F12-030-RS-TV-S-000-000 F12-030-RS-TV-T-000-000 F12-030-SF-IS-P-000-000 |
F12-040-MF-IV-D-000-0000 F12-040-MF-IV-K-000-000 F12-040-MF-IV-K-000-0000 F12-040-MS-SN-T-000-000 F12-040-MS-SV-S-000-0000 F12-040-MS-SV-T-000-000 F12-040-MS-SV-T-000-0000 F12-040-MS-TV-T-000-000 F12-040-RF-IV-K-000-0000 F12-060-MF-IV-D-000-0000 F12-060-MF-IV-K-000-0000 F12-060-MS-SV-S-000-0000 F12-060-MS-SV-T-000-0000 F12-060-RF-IV-K-000-0000 F12-060-RS-SV-T-000-0000 |
F12-080-LF-IV-K-000-0000 F12-080-MF-IV-D-000-0000 F12-080-MF-IV-K-000-0000 F12-080-MS-SV-T-000-0000 F12-080-RF-IV-K-000-0000 F12-080-RS-SV-T-000-0000 F12-090-MF-IV-D-000-0000 F12-090-MS-SV-S-000-0000 F12-110-MF-IV-K-000-0000 F12-110-MS-SV-S-000-0000 F12-110-RF-IV-K-000-0000 F12-110-RS-SV-T-000-0000 F12-125-RF-IV-K-000-0000 F12-152-MF-FV-G-000-0000 F12-152-MF-SV-S-000-0000 |
Process steps:
Customer inquiry: Customers will make inquiries before placing an order to understand product details and communication needs.
Quotation: According to customer needs, provide a formal quotation, including the name, model, quantity, delivery time, payment method, etc. of the goods.
Order confirmation: After the customer confirms the quotation, a formal purchase order will be placed.
Confirm the delivery time: communicate the delivery time with the production department, inform the factory of the order details, and arrange the production plan.
Sign an export contract: After the two parties confirm that it is correct, sign an export contract to establish a trade relationship.
Implement the letter of credit (if applicable): If the payment method of the letter of credit is used, the customer needs to be urged to issue the certificate and review the contents of the letter of credit.
Export stocking: According to the requirements of the contract and the letter of credit, arrange production, purchase raw materials and packaging, and prepare the goods.
Chartering and booking: Contact the freight forwarder to make a booking and arrange the transportation of goods.
Export inspection: Apply to the quality inspection department for export commodity inspection and provide relevant documents.
Apply for a write-off slip: apply for a write-off slip from the foreign exchange management department for subsequent foreign exchange write-off.
Export declaration: Declare exports to the customs and provide documents such as power of attorney for customs declaration, customs declaration form for export goods, commercial invoice, packing list, etc.
