Parker F12-30 Series Hydraulic Motor
F11-005、 F11-006、 F11-010、 F11-012、 F11-014、 F11-019、 F11-150、 F11-250、 F12-30、 F12-40、 F12-60、 F12-80、 F12-90、 F12-110、 F12-125、 F12-152、 F12-162、 F12-182、 F12-250
E-mail: hyd-sales2009@outlook.com
F11 series hydraulic motors: displacement range from 5cc to 250cc, specific specifications include 5cc, 6cc, 10cc, 12cc, 14cc, 19cc, 150cc, 250cc, etc.
F12 series hydraulic motors: displacement range from 30cc to 250cc, specific specifications include 30cc, 40cc, 60cc, 80cc, 90cc, 110cc, 125cc, 152cc, 162cc, 182cc, 250cc, etc.

Parker F12-30 series hydraulic motor displacement specification: 30cc (corresponding to F12-030 model) Maximum intermittent working pressure: 480bar (some models)
Continuous working pressure: 420bar
Torque: 10Nm (some models)
Speed range: up to 7300 rpm (ball plunger design supports high speed)
2. Product series characteristics
Model coverage: The F12 series offers a variety of displacement specifications, from 30cc to 250cc, suitable for different walking applications.
Rotation direction: Some models (such as F12-030-MF-IV-K) support two-way rotation.
Structural design:
40° oblique axis design, compact and lightweight
Multi-layer piston ring design to reduce internal leakage and enhance thermal shock resistance
3. Performance and applicability
Oil requirements:
Cleanliness must comply with ISO 18/13 standard
It is recommended to use a 10µm absolute precision filter
Applicable oil type: high-quality petroleum-based oil, HLP hydraulic oil or API CD oil
Application areas: industrial machinery, agricultural machinery, marine engineering, etc.
4. installation and interface
Flange standard:
Some models use ISO flanges (such as F12-060-MF-IV-D)
Optional DIN spline for shaft extension (standard option)
Shell pressure: The highest recommended pressure needs to be selected according to the spindle speed (the specific data is not clear)
5. Reference for other models
F12-030-MF-IV-K: SAE 6000 psi flange connection, ISO flange installation
F12-090-MF-IV-D: continuous working pressure 207bar, intermittent pressure 248bar.
| F11-005-GB-CV-K-000-0000 F11-005-HB-CV-K-000-000 F11-005-MB-CV-K-000-0000 F11-005-RB-CV-D-000-0000 F11-006-MB-CV-K-000-0000 F11-006-MB-IV-K-000-000 F11-010-HU-CV-K-000-0000 F11-010-MB-CV-K-000-0000 F11-010-RB-CV-K-000-0000 F11-012-QU-CV-K-000-000 F11-012-RB-CV-K-000-0000 F11-014-HB-CV-K-000-000 F11-014-LU-SV-S-000-0000 F11-014-SF-IV-K-000-0000 F11-019-HB-CV-D-000-0000 |
F11-019-MB-CN-K-000-0000 F11-019-MB-CV-K-000-0000 F11-019-RB-CV-K-000-0000 F12-030-LF-IV-K-000-000 F12-030-LF-IV-P-000-000 F12-030-LS-SV-S-000-000 F12-030-LS-SV-T-000-000 F12-030-LS-TV-P-000-000 F12-030-LS-TV-S-000-000 F12-030-LS-TV-T-000-000 F12-030-MF-IV-P-000-000 F12-030-RS-SV-S-000-000 F12-030-RS-TV-S-000-000 F12-030-RS-TV-T-000-000 F12-030-SF-IS-P-000-000 |
F12-040-MF-IV-D-000-0000 F12-040-MF-IV-K-000-000 F12-040-MF-IV-K-000-0000 F12-040-MS-SN-T-000-000 F12-040-MS-SV-S-000-0000 F12-040-MS-SV-T-000-000 F12-040-MS-SV-T-000-0000 F12-040-MS-TV-T-000-000 F12-040-RF-IV-K-000-0000 F12-060-MF-IV-D-000-0000 F12-060-MF-IV-K-000-0000 F12-060-MS-SV-S-000-0000 F12-060-MS-SV-T-000-0000 F12-060-RF-IV-K-000-0000 F12-060-RS-SV-T-000-0000 |
F12-080-LF-IV-K-000-0000 F12-080-MF-IV-D-000-0000 F12-080-MF-IV-K-000-0000 F12-080-MS-SV-T-000-0000 F12-080-RF-IV-K-000-0000 F12-080-RS-SV-T-000-0000 F12-090-MF-IV-D-000-0000 F12-090-MS-SV-S-000-0000 F12-110-MF-IV-K-000-0000 F12-110-MS-SV-S-000-0000 F12-110-RF-IV-K-000-0000 F12-110-RS-SV-T-000-0000 F12-125-RF-IV-K-000-0000 F12-152-MF-FV-G-000-0000 F12-152-MF-SV-S-000-0000 |
Process steps:
Customer inquiry: Customers will make inquiries before placing an order to understand product details and communication needs.
Quotation: According to customer needs, provide a formal quotation, including the name, model, quantity, delivery time, payment method, etc. of the goods.
Order confirmation: After the customer confirms the quotation, a formal purchase order will be placed.
Confirm the delivery time: communicate the delivery time with the production department, inform the factory of the order details, and arrange the production plan.
Sign an export contract: After the two parties confirm that it is correct, sign an export contract to establish a trade relationship.
Implement the letter of credit (if applicable): If the payment method of the letter of credit is used, the customer needs to be urged to issue the certificate and review the contents of the letter of credit.
Export stocking: According to the requirements of the contract and the letter of credit, arrange production, purchase raw materials and packaging, and prepare the goods.
Chartering and booking: Contact the freight forwarder to make a booking and arrange the transportation of goods.
Export inspection: Apply to the quality inspection department for export commodity inspection and provide relevant documents.
Apply for a write-off slip: apply for a write-off slip from the foreign exchange management department for subsequent foreign exchange write-off.
Export declaration: Declare exports to the customs and provide documents such as power of attorney for customs declaration, customs declaration form for export goods, commercial invoice, packing list, etc.
