Parker F12-80 Series Hydraulic Motor
F11-005、 F11-006、 F11-010、 F11-012、 F11-014、 F11-019、 F11-150、 F11-250、 F12-30、 F12-40、 F12-60、 F12-80、 F12-90、 F12-110、 F12-125、 F12-152、 F12-162、 F12-182、 F12-250
E-mail: hyd-sales2009@outlook.com
F11 series hydraulic motors: displacement range from 5cc to 250cc, specific specifications include 5cc, 6cc, 10cc, 12cc, 14cc, 19cc, 150cc, 250cc, etc.
F12 series hydraulic motors: displacement range from 30cc to 250cc, specific specifications include 30cc, 40cc, 60cc, 80cc, 90cc, 110cc, 125cc, 152cc, 162cc, 182cc, 250cc, etc.

Parker F12-80 series hydraulic motor core specifications
1. Basic performance parameters
Displacement: 80 cm3/rev (nominal 80cc), suitable for medium load scenarios.
Working pressure:
Maximum intermittent working pressure: 480 bar (peak pressure).
Continuous working pressure: 420 bar (long-term stable operation).
Speed range: up to 7300 rpm, support low-speed and high-torque start.
Torque: 10 Nm (some models).
2. Structure and design characteristics
Structure type: Curved shaft type axial plunger quantitative motor, the shaft and the cylinder block are at an angle of 40°, and the structure is compact.
Piston ring design: Laminated piston ring, reduces internal leakage, and has strong thermal shock resistance (-35℃ to 115℃).
Bearing configuration: heavy-duty roller bearings, resistant to high external loads and vibration.
3. Installation and interface
Oil port connection: SAE 6000 psi flange (code F).
Shaft extension form: DIN spline (standard option).
Direction of rotation: Two-way rotation design, supporting forward and reverse equivalent torque output.
Fourth, oil and environmental requirements
Oil cleanliness: ISO 18/13 (ISO 4406).
Filter: 10 µm absolute accuracy is recommended.
Operating temperature:
The system oil is ≤70°C, and the oil drain temperature is ≤90°C (standard shaft seal).
The fluorine rubber shaft seal (code V) can withstand the oil discharge temperature of 115°C.
V. Application areas
Heavy-duty scenarios such as industrial machinery, agricultural equipment, and ship propulsion.
Recommendation: When selecting the type, you need to confirm the installation flange standard (such as ISO or SAE) and the shaft extension form, and strictly control the cleanliness of the system oil to ensure the life and performance of the motor..
| F11-005-GB-CV-K-000-0000 F11-005-HB-CV-K-000-000 F11-005-MB-CV-K-000-0000 F11-005-RB-CV-D-000-0000 F11-006-MB-CV-K-000-0000 F11-006-MB-IV-K-000-000 F11-010-HU-CV-K-000-0000 F11-010-MB-CV-K-000-0000 F11-010-RB-CV-K-000-0000 F11-012-QU-CV-K-000-000 F11-012-RB-CV-K-000-0000 F11-014-HB-CV-K-000-000 F11-014-LU-SV-S-000-0000 F11-014-SF-IV-K-000-0000 F11-019-HB-CV-D-000-0000 |
F11-019-MB-CN-K-000-0000 F11-019-MB-CV-K-000-0000 F11-019-RB-CV-K-000-0000 F12-030-LF-IV-K-000-000 F12-030-LF-IV-P-000-000 F12-030-LS-SV-S-000-000 F12-030-LS-SV-T-000-000 F12-030-LS-TV-P-000-000 F12-030-LS-TV-S-000-000 F12-030-LS-TV-T-000-000 F12-030-MF-IV-P-000-000 F12-030-RS-SV-S-000-000 F12-030-RS-TV-S-000-000 F12-030-RS-TV-T-000-000 F12-030-SF-IS-P-000-000 |
F12-040-MF-IV-D-000-0000 F12-040-MF-IV-K-000-000 F12-040-MF-IV-K-000-0000 F12-040-MS-SN-T-000-000 F12-040-MS-SV-S-000-0000 F12-040-MS-SV-T-000-000 F12-040-MS-SV-T-000-0000 F12-040-MS-TV-T-000-000 F12-040-RF-IV-K-000-0000 F12-060-MF-IV-D-000-0000 F12-060-MF-IV-K-000-0000 F12-060-MS-SV-S-000-0000 F12-060-MS-SV-T-000-0000 F12-060-RF-IV-K-000-0000 F12-060-RS-SV-T-000-0000 |
F12-080-LF-IV-K-000-0000 F12-080-MF-IV-D-000-0000 F12-080-MF-IV-K-000-0000 F12-080-MS-SV-T-000-0000 F12-080-RF-IV-K-000-0000 F12-080-RS-SV-T-000-0000 F12-090-MF-IV-D-000-0000 F12-090-MS-SV-S-000-0000 F12-110-MF-IV-K-000-0000 F12-110-MS-SV-S-000-0000 F12-110-RF-IV-K-000-0000 F12-110-RS-SV-T-000-0000 F12-125-RF-IV-K-000-0000 F12-152-MF-FV-G-000-0000 F12-152-MF-SV-S-000-0000 |
Process steps:
Customer inquiry: Customers will make inquiries before placing an order to understand product details and communication needs.
Quotation: According to customer needs, provide a formal quotation, including the name, model, quantity, delivery time, payment method, etc. of the goods.
Order confirmation: After the customer confirms the quotation, a formal purchase order will be placed.
Confirm the delivery time: communicate the delivery time with the production department, inform the factory of the order details, and arrange the production plan.
Sign an export contract: After the two parties confirm that it is correct, sign an export contract to establish a trade relationship.
Implement the letter of credit (if applicable): If the payment method of the letter of credit is used, the customer needs to be urged to issue the certificate and review the contents of the letter of credit.
Export stocking: According to the requirements of the contract and the letter of credit, arrange production, purchase raw materials and packaging, and prepare the goods.
Chartering and booking: Contact the freight forwarder to make a booking and arrange the transportation of goods.
Export inspection: Apply to the quality inspection department for export commodity inspection and provide relevant documents.
Apply for a write-off slip: apply for a write-off slip from the foreign exchange management department for subsequent foreign exchange write-off.
Export declaration: Declare exports to the customs and provide documents such as power of attorney for customs declaration, customs declaration form for export goods, commercial invoice, packing list, etc.
