Home » Product » Parker F12-152 Series Hydraulic Motor

Parker F12-152 Series Hydraulic Motor

F11-005、 F11-006、 F11-010、 F11-012、 F11-014、 F11-019、 F11-150、 F11-250、 F12-30、 F12-40、 F12-60、 F12-80、 F12-90、 F12-110、 F12-125、 F12-152、 F12-162、 F12-182、 F12-250

                  E-mail: hyd-sales2009@outlook.com

Description

F11 series hydraulic motors:  displacement range from 5cc to 250cc, specific specifications include 5cc, 6cc, 10cc, 12cc, 14cc, 19cc, 150cc, 250cc, etc.
F12 series hydraulic motors:  displacement range from 30cc to 250cc, specific specifications include 30cc, 40cc, 60cc, 80cc, 90cc, 110cc, 125cc, 152cc, 162cc, 182cc, 250cc, etc.

Parker F12-152 series hydraulic motor core parameters
Parker F12-152 is a large-displacement oblique axial plunger quantitative motor, designed for heavy-duty applications.
Main specifications
Theoretical displacement: 152.4 cm3/rev
Working pressure:
Continuous working pressure: 420 bar
Peak/intermittent working pressure: 480 bar
Speed range:
Maximum speed: 7300 rpm
Key features:
High power density: 40° curved shaft design, compact structure
Installation and connection:
The mounting flange complies with CETOP, ISO, SAE and SAW standards

Selection and suggestion
Parker F12 series offers a variety of displacement specifications from 30cc to 250cc, so you can choose the most suitable model according to your specific torque and speed requirements.
Since different models may have differences in shaft extension, oil port and other configurations, it is recommended that you directly provide the complete model or specific application requirements in order to obtain the most accurate technical information and selection support.

F11-005-GB-CV-K-000-0000
F11-005-HB-CV-K-000-000
F11-005-MB-CV-K-000-0000
F11-005-RB-CV-D-000-0000
F11-006-MB-CV-K-000-0000
F11-006-MB-IV-K-000-000
F11-010-HU-CV-K-000-0000
F11-010-MB-CV-K-000-0000
F11-010-RB-CV-K-000-0000
F11-012-QU-CV-K-000-000
F11-012-RB-CV-K-000-0000
F11-014-HB-CV-K-000-000
F11-014-LU-SV-S-000-0000
F11-014-SF-IV-K-000-0000
F11-019-HB-CV-D-000-0000
F11-019-MB-CN-K-000-0000
F11-019-MB-CV-K-000-0000
F11-019-RB-CV-K-000-0000
F12-030-LF-IV-K-000-000
F12-030-LF-IV-P-000-000
F12-030-LS-SV-S-000-000
F12-030-LS-SV-T-000-000
F12-030-LS-TV-P-000-000
F12-030-LS-TV-S-000-000
F12-030-LS-TV-T-000-000
F12-030-MF-IV-P-000-000
F12-030-RS-SV-S-000-000
F12-030-RS-TV-S-000-000
F12-030-RS-TV-T-000-000
F12-030-SF-IS-P-000-000
F12-040-MF-IV-D-000-0000
F12-040-MF-IV-K-000-000
F12-040-MF-IV-K-000-0000
F12-040-MS-SN-T-000-000
F12-040-MS-SV-S-000-0000
F12-040-MS-SV-T-000-000
F12-040-MS-SV-T-000-0000
F12-040-MS-TV-T-000-000
F12-040-RF-IV-K-000-0000
F12-060-MF-IV-D-000-0000
F12-060-MF-IV-K-000-0000
F12-060-MS-SV-S-000-0000
F12-060-MS-SV-T-000-0000
F12-060-RF-IV-K-000-0000
F12-060-RS-SV-T-000-0000
F12-080-LF-IV-K-000-0000
F12-080-MF-IV-D-000-0000
F12-080-MF-IV-K-000-0000
F12-080-MS-SV-T-000-0000
F12-080-RF-IV-K-000-0000
F12-080-RS-SV-T-000-0000
F12-090-MF-IV-D-000-0000
F12-090-MS-SV-S-000-0000
F12-110-MF-IV-K-000-0000
F12-110-MS-SV-S-000-0000
F12-110-RF-IV-K-000-0000
F12-110-RS-SV-T-000-0000
F12-125-RF-IV-K-000-0000
F12-152-MF-FV-G-000-0000
F12-152-MF-SV-S-000-0000
Shipping & Delivery

Process steps:
Customer inquiry: Customers will make inquiries before placing an order to understand product details and communication needs.
Quotation: According to customer needs, provide a formal quotation, including the name, model, quantity, delivery time, payment method, etc. of the goods.
Order confirmation: After the customer confirms the quotation, a formal purchase order will be placed.
Confirm the delivery time: communicate the delivery time with the production department, inform the factory of the order details, and arrange the production plan.
Sign an export contract: After the two parties confirm that it is correct, sign an export contract to establish a trade relationship.
Implement the letter of credit (if applicable): If the payment method of the letter of credit is used, the customer needs to be urged to issue the certificate and review the contents of the letter of credit.
Export stocking: According to the requirements of the contract and the letter of credit, arrange production, purchase raw materials and packaging, and prepare the goods.
Chartering and booking: Contact the freight forwarder to make a booking and arrange the transportation of goods.
Export inspection: Apply to the quality inspection department for export commodity inspection and provide relevant documents.
Apply for a write-off slip: apply for a write-off slip from the foreign exchange management department for subsequent foreign exchange write-off.
Export declaration: Declare exports to the customs and provide documents such as power of attorney for customs declaration, customs declaration form for export goods, commercial invoice, packing list, etc.