PV2R23-59-125 YUKEN Double vane pump
Whats app: +86 13728707767
E-mail: hyd-sales2009@outlook.com
We are a professional manufacturer of hydraulic pumps, offering a complete range of products. Inquiries are welcome! (#^.^#)
Parameter Description of YUKEN Double Vane Pump PV2R23-59-125
1. Basic Information
-
Model: PV2R23-59-125
-
Brand: YUKEN
-
Type: Fixed Displacement Double Vane Pump
-
Structure: Tandem combination (two single vane pumps share one drive shaft, with one suction port and two independent discharge ports, allowing output flow to supply separate hydraulic circuits)[7][8]
-
Application Scope: Hydraulic systems requiring two different flow rates, such as medium and large-scale industrial equipment.
2. Key Technical Parameters
-
Geometric Displacement: The model numbers “59” and “125” represent the nominal displacement of the two single pumps respectively. The small-displacement pump (cover end pump) is 58.2 cm³/rev (58.2 ml/r), and the large-displacement pump (shaft end pump) is 122.2 cm³/rev (122.2 ml/r)[11].
-
Maximum Operating Pressure: 21 MPa (210 bar) when using anti-wear petroleum-based hydraulic oil; the maximum pressure is limited to 17.5 MPa (175 bar) for water-containing fluids and 14 MPa (140 bar) for common hydraulic oil[11].
-
Rotational Speed Range: Normal operating speed range is 600 ~ 1800 r/min; the minimum allowable speed is 600 r/min to ensure stable suction and lubrication, and long-term operation shall not exceed 1800 r/min. Note that the maximum speed for the 125 displacement pump is limited to 1200 r/min.
-
Weight: Approximately 51 kg (subject to the actual product, related to the installation structure and seal type)[4].
-
Noise Level: Adopts low-noise structural design, and the specific noise value complies with industrial standards, detailed parameters can be found in YUKEN official product manual[3].
-
Minimum Suction Pressure: When the rotational speed is less than 1700 r/min, the minimum suction pressure is -20 kPa; when the rotational speed is 1700 ~ 1800 r/min, the minimum suction pressure is 0 kPa to avoid cavitation damage[5][6].
3. Hydraulic Oil Requirements
-
Recommended Oil Type: Petroleum-based anti-wear hydraulic oil or R&O type hydraulic oil, preferably conforming to ISO VG 32 or ISO VG 46 specifications to ensure lubrication and sealing performance[7][11].
-
Alternative Oil Types: If synthetic hydraulic oil (such as phosphate esters) is used, special fluororubber seals are required, and the model should be prefixed with “F-” when ordering[7]. Water-glycol fluid can be used for the standard pump without additional modification, while other aqueous hydraulic fluids require consulting the manufacturer for pressure limitation.
-
Oil Viscosity & Temperature: The recommended oil viscosity and temperature range shall comply with YUKEN official specifications; especially when starting at low speed, the maximum oil viscosity is limited to ensure smooth start-up[6].
4. Installation & Operation Notes
-
Avoid dry rotation and overload during operation, prevent air inhalation and excessive suction vacuum, so as to avoid wear of vanes, rotors and oil distribution plates[3].
-
The pump has a specified rotation direction (clockwise when viewed from the shaft end as standard); reverse rotation is strictly prohibited, which will change the suction and discharge direction and damage internal components. Anti-clockwise rotation pumps are available on request, please consult YUKEN for details[8].
-
During installation, the oil distribution plate and stator must be correctly positioned with positioning pins; the vane, rotor and oil distribution plate shall not be installed in reverse. When the pump is used at a speed below 1200 r/min, the suction port should be installed upward to facilitate oil suction.
-
When starting the pump initially or after long-term shutdown, an air release valve should be installed on the discharge side to release air; it is recommended to perform intermittent operation under no-load conditions to ensure sufficient lubrication.
-
Pipe flange kits are not included with the pump; please select the appropriate flange kit according to the connection type (threaded, socket welding or butt welding) when ordering.
| PV2R12-10/26-F-RAA-43 PV2R12-10/26-F-RM-31 PV2R12-10/33-F-RAA-43 PV2R12-10/33-F-RM-31 PV2R12-10/41-F-LAA-43 PV2R12-10/41-F-RAA-43 PV2R12-10/41-F-RM-31 PV2R12-10/47-F-RAA-43 PV2R12-10/47-F-RM-31 PV2R12-10/53-F-RAA-43 PV2R12-10/53-F-RM-31 PV2R12-14/26-F-RAA-43 PV2R12-14/26-F-RM-31 PV2R12-14/33-F-RAA-43 PV2R12-14/33-F-RM-31 PV2R12-14/41-F-RAA-43 PV2R12-14/41-F-RM-31 PV2R12-14/47-F-LAA-43 PV2R12-14/47-F-RAA-43 PV2R12-14/47-F-RM-31 PV2R12-14/53-F-RAA-43 PV2R12-14/53-F-RM-31 PV2R12-17/26-F-RAA-43 PV2R12-17/26-F-RM-31 PV2R12-17/33-F-RAA-43 PV2R12-17/33-F-RM-31 PV2R12-17/41-F-RAA-43 PV2R12-17/41-F-RM-31 PV2R12-17/47-F-RAA-43 PV2R12-17/47-F-RM-31 PV2R12-17/53-F-LAA-43 PV2R12-17/53-F-RAA-43 PV2R12-17/53-F-RM-31 PV2R12-19/26-F-RAA-43 PV2R12-19/26-F-RAB-43 PV2R12-19/26-F-RM-31 PV2R12-19/33-F-RAA-43 PV2R12-19/33-F-RM-31 PV2R12-19/41-F-RAA-43 PV2R12-19/41-F-RM-31 PV2R12-19/47-F-RAA-43 PV2R12-19/47-F-RM-31 PV2R12-19/53-F-RAA-43 PV2R12-19/53-F-RM-31 PV2R12-23/26-F-RAA-43 PV2R12-23/26-F-RM-31 PV2R12-23/33-F-RAA-43 PV2R12-23/33-F-RAB-43 PV2R12-23/33-F-RM-31 PV2R12-23/41-F-RAA-43 PV2R12-23/41-F-RM-31 PV2R12-23/47-F-RAA-43 |
PV2R12-23/47-F-RM-31 PV2R12-23/53-F-RAA-43 PV2R12-23/53-F-RM-31 PV2R12-25/26-F-RAA-43 PV2R12-25/26-F-RM-31 PV2R12-25/33-F-RAA-43 PV2R12-25/33-F-RM-31 PV2R12-25/41-F-RAA-43 PV2R12-25/41-F-RAB-43 PV2R12-25/41-F-RM-31 PV2R12-25/47-F-RAA-43 PV2R12-25/47-F-RM-31 PV2R12-25/53-F-RAA-43 PV2R12-25/53-F-RM-31 PV2R12-31/26-F-RAA-43 PV2R12-31/26-F-RM-31 PV2R12-31/33-F-RAA-43 PV2R12-31/33-F-RM-31 PV2R12-31/41-F-RAA-43 PV2R12-31/41-F-RM-31 PV2R12-31/47-F-RAA-43 PV2R12-31/47-F-RAB-43 PV2R12-31/47-F-RM-31 PV2R12-31/53-F-RAA-43 PV2R12-31/53-F-RM-31 PV2R12-6/26-F-LAA-43 PV2R12-6/26-F-RAA-43 PV2R12-6/26-F-RM-31 PV2R12-6/33-F-RAA-43 PV2R12-6/33-F-RM-31 PV2R12-6/41-F-RAA-43 PV2R12-6/41-F-RAC-43 PV2R12-6/41-F-RM-31 PV2R12-6/47-F-RAA-43 PV2R12-6/47-F-RM-31 PV2R12-6/53-F-RAA-43 PV2R12-6/53-F-RM-31 PV2R12-8/26-F-RAA-43 PV2R12-8/26-F-RM-31 PV2R12-8/33-F-LAA-43 PV2R12-8/33-F-RAA-43 PV2R12-8/33-F-RM-31 PV2R12-8/41-F-RAA-43 PV2R12-8/41-F-RM-31 PV2R12-8/47-F-RAA-43 PV2R12-8/47-F-RM-31 PV2R12-8/53-F-RAA-43 PV2R12-8/53-F-RM-31 PV2R13-14-76-F-RAAA-43 PV2R13-14-94-F-LAA-43 PV2R13-14-94-F-RAAA-43 PV2R13-14-94-F-RM-43 |
PV2R13-17-66-F-RAAA-43 PV2R13-17-76-F-LAA-43 PV2R13-17-76-F-RAAA-43 PV2R13-17-76-F-RM-43 PV2R13-19-66-F-LAA-43 PV2R13-19-66-F-RAAA-43 PV2R13-19-66-F-RM-43 PV2R13-23-60-F-LAA-43 PV2R13-23-60-F-RAAA-43 PV2R13-23-60-F-RM-43 PV2R13-25-52-F-RAAA-43 PV2R13-31-52-F-RAAA-43 PV2R13-8-116-F-LAA-43 PV2R13-8-116-F-RAAA-43 PV2R13-8-116-F-RM-43 PV2R13-8-94-F-RAAA-43 PV2R21-26/26-F-LAA-43 PV2R21-26/26-F-RAA-43 PV2R21-26/26-F-RM-31 PV2R21-26/33-F-RAA-43 PV2R21-26/33-F-RAB-43 PV2R21-26/33-F-RM-31 PV2R21-26/41-F-RAA-43 PV2R21-26/41-F-RM-31 PV2R21-26/47-F-RAA-43 PV2R21-26/47-F-RM-31 PV2R21-26/53-F-RAA-43 PV2R21-26/53-F-RM-31 PV2R21-33/26-F-RAA-43 PV2R21-33/26-F-RM-31 PV2R21-33/33-F-LAA-43 PV2R21-33/33-F-RAA-43 PV2R21-33/33-F-RM-31 PV2R21-33/41-F-RAA-43 PV2R21-33/41-F-RAB-43 PV2R21-33/41-F-RM-31 PV2R21-33/47-F-RAA-43 PV2R21-33/47-F-RM-31 PV2R21-33/53-F-RAA-43 PV2R21-33/53-F-RM-31 PV2R21-41/26-F-RAA-43 PV2R21-41/26-F-RM-31 PV2R21-41/33-F-RAA-43 PV2R21-41/33-F-RM-31 PV2R21-41/41-F-LAA-43 PV2R21-41/41-F-RAA-43 PV2R21-41/41-F-RM-31 PV2R21-41/47-F-RAA-43 PV2R21-41/47-F-RAB-43 PV2R21-41/47-F-RM-31 PV2R21-41/53-F-RAA-43 PV2R21-41/53-F-RM-31 |
PV2R21-47/26-F-RAA-43 PV2R21-47/26-F-RM-31 PV2R21-47/33-F-RAA-43 PV2R21-47/33-F-RM-31 PV2R21-47/41-F-RAA-43 PV2R21-47/41-F-RM-31 PV2R21-47/47-F-LAA-43 PV2R21-47/47-F-RAA-43 PV2R21-47/47-F-RM-31 PV2R21-47/53-F-RAA-43 PV2R21-47/53-F-RAB-43 PV2R21-47/53-F-RM-31 PV2R21-53/26-F-RAA-43 PV2R21-53/26-F-RAB-43 PV2R21-53/26-F-RM-31 PV2R21-53/33-F-RAA-43 PV2R21-53/33-F-RM-31 PV2R21-53/41-F-RAA-43 PV2R21-53/41-F-RM-31 PV2R21-53/47-F-RAA-43 PV2R21-53/47-F-RM-31 PV2R21-53/53-F-LAA-43 PV2R21-53/53-F-RAA-43 PV2R21-53/53-F-RM-31 PV2R24-41-136-F-RAA-43 PV2R24-41-136-F-RM-43 PV2R24-41-153-F-LAA-43 PV2R24-41-153-F-RAA-43 PV2R24-41-184-F-RAA-43 PV2R24-41-200-F-RAA-43 PV2R24-47-136-F-RAA-43 PV2R24-47-136-F-RM-43 PV2R24-47-153-F-LAA-43 PV2R24-47-153-F-RAA-43 PV2R24-47-184-F-RAA-43 PV2R24-47-200-F-RAA-43 PV2R24-53-136-F-RAA-43 PV2R24-53-136-F-RM-43 PV2R24-53-153-F-LAA-43 PV2R24-53-153-F-RAA-43 PV2R24-53-184-F-RAA-43 PV2R24-53-200-F-RAA-43 PV2R24-59-136-F-RAA-43 PV2R24-59-136-F-RM-43 PV2R24-59-153-F-LAA-43 PV2R24-59-153-F-RAA-43 PV2R24-59-184-F-RAA-43 PV2R24-59-200-F-RAA-43 PV2R24-65-136-F-RAA-43 PV2R24-65-136-F-RM-43 PV2R24-65-153-F-LAA-43 PV2R24-65-153-F-RAA-43 |
PV2R24-65-184-F-RAA-43 PV2R24-65-200-F-RAA-43 PV2R32-52/52-F-RAA-43 PV2R32-52/52-F-RM-31 PV2R32-52/60-F-RAA-43 PV2R32-52/60-F-RM-31 PV2R32-52/66-F-RAA-43 PV2R32-52/66-F-RM-31 PV2R32-52/76-F-RAA-43 PV2R32-52/76-F-RM-31 PV2R32-52/94-F-RAA-43 PV2R32-52/94-F-RM-31 PV2R32-60/52-F-RAA-43 PV2R32-60/52-F-RM-31 PV2R32-60/60-F-RAA-43 PV2R32-60/60-F-RM-31 PV2R32-60/66-F-RAA-43 PV2R32-60/66-F-RM-31 PV2R32-60/76-F-RAA-43 PV2R32-60/76-F-RM-31 PV2R32-60/94-F-RAA-43 PV2R32-60/94-F-RM-31 PV2R32-66/52-F-RAA-43 PV2R32-66/52-F-RM-31 PV2R32-66/60-F-RAA-43 PV2R32-66/60-F-RM-31 PV2R32-66/66-F-RAA-43 PV2R32-66/66-F-RM-31 PV2R32-66/76-F-RAA-43 PV2R32-66/76-F-RM-31 PV2R32-66/94-F-RAA-43 PV2R32-66/94-F-RM-31 PV2R32-76/52-F-RAA-43 PV2R32-76/52-F-RM-31 PV2R32-76/60-F-RAA-43 PV2R32-76/60-F-RM-31 PV2R32-76/66-F-RAA-43 PV2R32-76/66-F-RM-31 PV2R32-76/76-F-RAA-43 PV2R32-76/76-F-RM-31 PV2R32-76/94-F-RAA-43 PV2R32-76/94-F-RM-31 PV2R32-94/52-F-RAA-43 PV2R32-94/52-F-RM-31 PV2R32-94/60-F-RAA-43 PV2R32-94/60-F-RM-31 PV2R32-94/66-F-RAA-43 PV2R32-94/66-F-RM-31 PV2R32-94/76-F-RAA-43 PV2R32-94/76-F-RM-31 PV2R32-94/94-F-RAA-43 PV2R32-94/94-F-RM-31 |
Process steps:
Customer inquiry: Customers will make inquiries before placing an order to understand product details and communication needs.
Quotation: According to customer needs, provide a formal quotation, including the name, model, quantity, delivery time, payment method, etc. of the goods.
Order confirmation: After the customer confirms the quotation, a formal purchase order will be placed.
Confirm the delivery time: communicate the delivery time with the production department, inform the factory of the order details, and arrange the production plan.
Sign an export contract: After the two parties confirm that it is correct, sign an export contract to establish a trade relationship.
Implement the letter of credit (if applicable): If the payment method of the letter of credit is used, the customer needs to be urged to issue the certificate and review the contents of the letter of credit.
Export stocking: According to the requirements of the contract and the letter of credit, arrange production, purchase raw materials and packaging, and prepare the goods.
Chartering and booking: Contact the freight forwarder to make a booking and arrange the transportation of goods.
Export inspection: Apply to the quality inspection department for export commodity inspection and provide relevant documents.
Apply for a write-off slip: apply for a write-off slip from the foreign exchange management department for subsequent foreign exchange write-off.
Export declaration: Declare exports to the customs and provide documents such as power of attorney for customs declaration, customs declaration form for export goods, commercial invoice, packing list, etc.

