Home » Product » PV2R4-237 Series YUKEN Single Vane Pump

PV2R4-237 Series YUKEN Single Vane Pump

PV2R1-6、PV2R1-8、PV2R1-10PV2R1-12、PV2R1-14、PV2R1-17
PV2R1-19、PV2R1-23、PV2R1-25、PV2R1-31、PV2R2-41、PV2R2-47
PV2R2-53、PV2R2-59、PV2R2-65、PV2R3-76、PV2R3-94、PV2R3-116
PV2R4-136、PV2R4-153、PV2R4-184、PV2R4-200、PV2R4-237

Description

“PV2R” Series YUKEN Single Vane Pump :

PV2R1-6、 PV2R1-8、 PV2R1-10、 PV2R1-12、 PV2R1-14、 PV2R1-17、 PV2R1-19、 PV2R1-23
PV2R1-25、 PV2R1-31、PV2R2-41、PV2R2-47、 PV2R2-53、 PV2R2-59、 PV2R2-65、 PV2R3-76
PV2R3-94、PV2R3-116、PV2R4-136、 PV2R4-153、PV2R4-184、 PV2R4-200、 PV2R4-237

PV2R4-237 Series YUKEN Single Vane Pump

1. Series Overview

The PV2R4-237 series is a high-performance single vane pump under YUKEN PV2R product line, designed for ultra-large displacement applications. It features stable operation, high efficiency, and strong durability, widely used in various industrial hydraulic systems such as machine tools, plastic machinery, and heavy equipment. All models in this series adopt advanced vane structure design, ensuring low noise and long service life.

2. Hot-selling Models

1. PV2R4-237-F-RAA-43 2. PV2R4-237-F-RM-31 3. PV2R4-237-F-RFAL-43 4. PV2R4-237-F-LAA-43 5. PV2R4-237-F-RAB-43
6. PV2R4-237-F-RAC-43 7. PV2R4-237-F-RM-43 8. PV2R4-237-F-RAF-43 9. PV2R4-237-F-RFAL-31 10. PV2R4-237-F-RFAL-43
11. PV2R4-237-F-RAA-43

3. Model Suffix Explanation (Brief)

– F: Standard vane structure
– RAA/RM/RFAL/LAA/RAB/RAC: Different installation and connection specifications
– 43/31: Standard pressure rating and temperature adaptation parameters
Shipping & Delivery

Process steps:
Customer inquiry: Customers will make inquiries before placing an order to understand product details and communication needs.
Quotation: According to customer needs, provide a formal quotation, including the name, model, quantity, delivery time, payment method, etc. of the goods.
Order confirmation: After the customer confirms the quotation, a formal purchase order will be placed.
Confirm the delivery time: communicate the delivery time with the production department, inform the factory of the order details, and arrange the production plan.
Sign an export contract: After the two parties confirm that it is correct, sign an export contract to establish a trade relationship.
Implement the letter of credit (if applicable): If the payment method of the letter of credit is used, the customer needs to be urged to issue the certificate and review the contents of the letter of credit.
Export stocking: According to the requirements of the contract and the letter of credit, arrange production, purchase raw materials and packaging, and prepare the goods.
Chartering and booking: Contact the freight forwarder to make a booking and arrange the transportation of goods.
Export inspection: Apply to the quality inspection department for export commodity inspection and provide relevant documents.
Apply for a write-off slip: apply for a write-off slip from the foreign exchange management department for subsequent foreign exchange write-off.
Export declaration: Declare exports to the customs and provide documents such as power of attorney for customs declaration, customs declaration form for export goods, commercial invoice, packing list, etc.