Home » Product » PVB10-FLD-XY-31-M-10 Vickers Axial Piston Pumps

PVB10-FLD-XY-31-M-10 Vickers Axial Piston Pumps

PVB 5/6, PVB 10/15, PVB 20/29, PVB 45 and PVB 90 to SAE
PVB 5/6, PVB 10/15, PVB 20/29 to DIN/ISO 3019, Part 2

   Whats app: +86 13728707767
   E-mail: hyd-sales2009@outlook.com
We are a professional manufacturer of hydraulic pumps, offering a complete range of products. Inquiries are welcome! (#^.^#)

Description

Specifications of Vickers Hydraulic Piston Pump PVB10-FLD-XY-31-M-10

1. Model Code Breakdown

Code Segment
Detailed Meaning
PVB
Variable displacement axial piston pump (inline design), compliant with SAE standards and DIN/ISO 3019 (Part 2).
10
Nominal displacement size: 21.10 cm³/rev (1.29 in³/rev).
F
Mounting type: SAE 2-bolt flange mounting.
LD
Control type: Load sensing compensator with remote pressure override capability.
XY
Special design option for PVB10 series, matching the standard configuration of the pump model.
31
Pump design code: Specifically applicable to PVB10 and PVB15 series pumps.
M
Control operation type: Lever control (mechanical lever operation).
10
Control design number: Suitable for “H” (handwheel) and “M” (lever) control types of PVB series pumps.

2. Core Technical Specifications

Parameter
Value
Remarks
Displacement
21.10 cm³/rev (1.29 in³/rev)
Theoretical displacement, without efficiency and tolerance considerations.
Maximum Operating Pressure
210 bar (3000 psi)
Using anti-wear hydraulic oil; 140 bar (2000 psi) when using water-glycol or oil-in-water emulsion.
Maximum Shaft Speed
1800 r/min
Continuous operating speed; avoid exceeding the limit to prevent component damage.
Mounting Type
SAE 2-bolt flange
Standard flange mounting for easy installation in hydraulic systems.
Control Type
Load sensing compensator + lever control (M)
With remote pressure override function, can closely match system pressure and flow demand.
Approximate Weight
15 kg (33.07 lb)
Reference weight for PVB10/15 series pumps.
Fluid Requirement
Anti-wear hydraulic oil, water-glycol, oil-in-water emulsion
Fluid cleanliness should meet ISO 18/14 standard.
Application Scope
Mining machinery, injection molding machines, metal forming equipment, oil and gas equipment, etc.
Suitable for harsh industrial operating environments.

3. Supplementary Notes

  • All parameters are theoretical values, and actual performance may vary slightly due to installation conditions, fluid quality and ambient temperature.
  • Do not exceed the maximum pressure and speed limits during operation to ensure the service life of the pump.
  • The pump is compatible with a variety of hydraulic fluids, and the operating pressure should be adjusted according to the selected fluid type.
  • For detailed installation and maintenance guidelines, refer to the official Eaton Vickers technical manual (Document No.: i3282s).

PVB10-FLD-XY-31-M-10
PVB10-FLS-31-C-11
PVB10-FLS-31-CM-11
PVB10-FLSW-31-C-11
PVB10-FLSW-31-CC-11
PVB10-FLSWY-31-C-11
PVB10-FLSWY-31-CC-11
PVB10-FLSWY-31-CG-20
PVB10-FLSXY-31-C-11
PVB10-FLSXY-31-CCD-20
PVB10-FLSY-31-C-11
PVB10-FLSY-31-CMC-11
PVB10-FRS-31-C-11
PVB10-FRS-31-CVP-12
PVB10-FRSWY-31-C-11
PVB10-FRSXY-31-CMC-11
PVB10-FRSY-31-C-11
PVB10-LS-31-C-11
PVB10-LS-31-CVP-12
PVB10-UDW-21-M-10
PVB15-FLD-31-CMC-11
PVB15-FLS-31-C-11
PVB15-FRS-31-CM-11
PVB15-FRSW-31-CME-11
PVB15-LS-31-CVP-12
PVB15-RS-31-CAG-20
PVB15-SFW-31-CC-11
PVB15-SFX-31-CM-11
PVB15-UDG-21-M-10
PVB15-WY-31-C-11
PVB15-XY-31-CG-20
PVB20-FRS-20-CG-20
PVB20-FSFW-20-C-11
PVB20-FSFX-20-CM-11
PVB20-LS-20-C-11
PVB20-RS-20-CG-20
PVB20-RS-20-CM-11
PVB20-RS-20-CMC-11
PVB20-RS-20-CVP-11
PVB20-RS-21-C-11
PVB20-RS-21-CC-11
PVB20-RS-21-CM-11
PVB20-S-20-D-10
PVB29-FLD-20-C-11
PVB29-FRS-20-CMC-11
PVB29-FRSW-20-CME-11
PVB29-FSFW-20-CM-11
PVB29-FSFX-20-C-11
PVB29-LS-20-CM-11
PVB29-LSW-20-CVP-12
PVB29-RS-20-C-11
PVB29-RS-20-CC-11
PVB29-RS-20-CG-20
PVB29-S-20-D-10
PVB29-UDG-21-M-10
PVB45-ARSF-10-CA
PVB45-FLD-20-D-10
PVB45-FRSF-20-C-11
PVB45-SFW-20-C-11
PVB45-SFX-20-CM-11
PVB45A-RSF-10-CA-11
PVB45A-RSF-11-CAG-20
PVB5-FLD-20-C-11
PVB5-FLS-20-C-11
PVB5-FRS-20-CM-11
PVB5-FRSW-20-CG-20
PVB5-FSW-20-CC-11
PVB5-LS-20-C-11-PRC
PVB5-LSW-20-CVP-12
PVB5-RDY-20-CG-11
PVB5-RS-20-CMC-11
PVB5-SFX-20-CM-11
PVB5-WY-20-CG-20
PVB5-XY-20-C-10
PVB6-FLD-20-CMC-11
PVB6-FLS-20-CM-11
PVB6-FRS-20-CC-11
PVB6-FRSW-20-CME-11
PVB6-LS-20-CVP-12
PVB6-RS-20-C-11
PVB6-RS-20-CAG-20
PVB6-RSW-20-CMC-11-PRC
PVB45-RSF-20-CC-11-PRC
PVB15-RS-Y-30-CMC-11-JA
PVB6-SFW-20-CM-11
PVB6-UDG-21-M-10
PVB6-WY-20-C-10
PVB6-XY-20-CG-20
PVB90-FDF-20-D-10
PVB90-FLD-20-CMC-11
PVB90-FLSF-20-C-10
PVB90-FLSF-20-CC-11
PVB90-FRS-20-CVP-12
PVB90-FRSF-20-C-10
PVB90-FRSF-20-CM-11
PVB90-FRSW-20-CME-11
PVB90-LS-20-C-11
PVB90-RS-20-CG-20
PVB90-SFW-20-C-11
PVB90-SFX-20-CM-11

Vickers PVB Series Variable Piston Pump Catalog Download:

https://www.klhyd.com/wp-content/uploads/2026/03/vickers-piston-pump-catalogue-PVB.pdf

 

Shipping & Delivery

Process steps:
Customer inquiry: Customers will make inquiries before placing an order to understand product details and communication needs.
Quotation: According to customer needs, provide a formal quotation, including the name, model, quantity, delivery time, payment method, etc. of the goods.
Order confirmation: After the customer confirms the quotation, a formal purchase order will be placed.
Confirm the delivery time: communicate the delivery time with the production department, inform the factory of the order details, and arrange the production plan.
Sign an export contract: After the two parties confirm that it is correct, sign an export contract to establish a trade relationship.
Implement the letter of credit (if applicable): If the payment method of the letter of credit is used, the customer needs to be urged to issue the certificate and review the contents of the letter of credit.
Export stocking: According to the requirements of the contract and the letter of credit, arrange production, purchase raw materials and packaging, and prepare the goods.
Chartering and booking: Contact the freight forwarder to make a booking and arrange the transportation of goods.
Export inspection: Apply to the quality inspection department for export commodity inspection and provide relevant documents.
Apply for a write-off slip: apply for a write-off slip from the foreign exchange management department for subsequent foreign exchange write-off.
Export declaration: Declare exports to the customs and provide documents such as power of attorney for customs declaration, customs declaration form for export goods, commercial invoice, packing list, etc.