PVB45-FLD-20-D-10 Vickers Piston Pumps
PVB 5/6, PVB 10/15, PVB 20/29, PVB 45 and PVB 90 to SAE
PVB 5/6, PVB 10/15, PVB 20/29 to DIN/ISO 3019, Part 2
Whats app: +86 13728707767
E-mail: hyd-sales2009@outlook.com
We are a professional manufacturer of hydraulic pumps, offering a complete range of products. Inquiries are welcome! (#^.^#)
Technical Parameters of Vickers Piston Pump PVB45-FLD-20-D-10
Basic Information
-
Model: PVB45-FLD-20-D-10
-
Product Series: PVB Series
-
Pump Type: Axial Variable Piston Pump
-
Brand: Vickers (Eaton Vickers)
Core Performance Parameters
-
Displacement: 94.5 cm³/r (5.76 in³/r)
-
Maximum Working Pressure: 210 bar (3000 psi)
-
Pressure Adjustment Range (Handwheel/Levers Control): 10 – 100 bar (150 – 1500 psi)
-
Maximum Speed: 3600 r/min
-
Volumetric Efficiency: ≥ 95% (typical)
-
Mechanical Efficiency: High (typical for Vickers PVB series)
Structural & Installation Parameters
-
Shaft Extension & Port Type: FLD (Flanged main ports, specific shaft extension, double-side center design)
-
Through Shaft Option: Not applicable (consistent with model designation)
-
Pump Design Code: 20 (for all other models except specified ones)
-
Mounting Type: Flange Mounting (complies with DIN/ISO 3019, Part 2)
-
Approximate Weight: 96 kg (211 lb)
Control Parameters
-
Control Type: D (Handwheel/Levers Control, double-side center design)
-
Control Design Number: 10 (for “D” type handwheel/levers control)
-
Control Feature: Enables flexible adjustment of displacement and pressure through handwheel or lever operation
Medium & Working Conditions
-
Applicable Medium: Various hydraulic oils (anti-wear hydraulic oil is recommended) <superscript:4><superscript:5>
-
Maximum Working Pressure with Water-Glycol or Water-in-Oil Emulsion: 140 bar (2000 psi)
-
Operating Temperature Range: Suitable for industrial standard hydraulic working temperature (not explicitly specified in official data, subject to actual application)
Standards & Certifications
-
Compliance: DIN/ISO 3019, Part 2
| PVB10-FLD-XY-31-M-10 PVB10-FLS-31-C-11 PVB10-FLS-31-CM-11 PVB10-FLSW-31-C-11 PVB10-FLSW-31-CC-11 PVB10-FLSWY-31-C-11 PVB10-FLSWY-31-CC-11 PVB10-FLSWY-31-CG-20 PVB10-FLSXY-31-C-11 PVB10-FLSXY-31-CCD-20 PVB10-FLSY-31-C-11 PVB10-FLSY-31-CMC-11 PVB10-FRS-31-C-11 PVB10-FRS-31-CVP-12 PVB10-FRSWY-31-C-11 PVB10-FRSXY-31-CMC-11 PVB10-FRSY-31-C-11 PVB10-LS-31-C-11 PVB10-LS-31-CVP-12 PVB10-UDW-21-M-10 |
PVB15-FLD-31-CMC-11 PVB15-FLS-31-C-11 PVB15-FRS-31-CM-11 PVB15-FRSW-31-CME-11 PVB15-LS-31-CVP-12 PVB15-RS-31-CAG-20 PVB15-SFW-31-CC-11 PVB15-SFX-31-CM-11 PVB15-UDG-21-M-10 PVB15-WY-31-C-11 PVB15-XY-31-CG-20 PVB20-FRS-20-CG-20 PVB20-FSFW-20-C-11 PVB20-FSFX-20-CM-11 PVB20-LS-20-C-11 PVB20-RS-20-CG-20 PVB20-RS-20-CM-11 PVB20-RS-20-CMC-11 PVB20-RS-20-CVP-11 PVB20-RS-21-C-11 |
PVB20-RS-21-CC-11 PVB20-RS-21-CM-11 PVB20-S-20-D-10 PVB29-FLD-20-C-11 PVB29-FRS-20-CMC-11 PVB29-FRSW-20-CME-11 PVB29-FSFW-20-CM-11 PVB29-FSFX-20-C-11 PVB29-LS-20-CM-11 PVB29-LSW-20-CVP-12 PVB29-RS-20-C-11 PVB29-RS-20-CC-11 PVB29-RS-20-CG-20 PVB29-S-20-D-10 PVB29-UDG-21-M-10 PVB45-ARSF-10-CA PVB45-FLD-20-D-10 PVB45-FRSF-20-C-11 PVB45-SFW-20-C-11 PVB45-SFX-20-CM-11 |
PVB45A-RSF-10-CA-11 PVB45A-RSF-11-CAG-20 PVB5-FLD-20-C-11 PVB5-FLS-20-C-11 PVB5-FRS-20-CM-11 PVB5-FRSW-20-CG-20 PVB5-FSW-20-CC-11 PVB5-LS-20-C-11-PRC PVB5-LSW-20-CVP-12 PVB5-RDY-20-CG-11 PVB5-RS-20-CMC-11 PVB5-SFX-20-CM-11 PVB5-WY-20-CG-20 PVB5-XY-20-C-10 PVB6-FLD-20-CMC-11 PVB6-FLS-20-CM-11 PVB6-FRS-20-CC-11 PVB6-FRSW-20-CME-11 PVB6-LS-20-CVP-12 PVB6-RS-20-C-11 |
PVB6-RS-20-CAG-20 PVB6-RSW-20-CMC-11-PRC PVB45-RSF-20-CC-11-PRC PVB15-RS-Y-30-CMC-11-JA PVB6-SFW-20-CM-11 PVB6-UDG-21-M-10 PVB6-WY-20-C-10 PVB6-XY-20-CG-20 PVB90-FDF-20-D-10 PVB90-FLD-20-CMC-11 PVB90-FLSF-20-C-10 PVB90-FLSF-20-CC-11 PVB90-FRS-20-CVP-12 PVB90-FRSF-20-C-10 PVB90-FRSF-20-CM-11 PVB90-FRSW-20-CME-11 PVB90-LS-20-C-11 PVB90-RS-20-CG-20 PVB90-SFW-20-C-11 PVB90-SFX-20-CM-11 |
Vickers Variable Piston Pump PVB Series Catalog Download:
https://www.klhyd.com/wp-content/uploads/2026/03/vickers-piston-pump-catalogue-PVB.pdf
Process steps:
Customer inquiry: Customers will make inquiries before placing an order to understand product details and communication needs.
Quotation: According to customer needs, provide a formal quotation, including the name, model, quantity, delivery time, payment method, etc. of the goods.
Order confirmation: After the customer confirms the quotation, a formal purchase order will be placed.
Confirm the delivery time: communicate the delivery time with the production department, inform the factory of the order details, and arrange the production plan.
Sign an export contract: After the two parties confirm that it is correct, sign an export contract to establish a trade relationship.
Implement the letter of credit (if applicable): If the payment method of the letter of credit is used, the customer needs to be urged to issue the certificate and review the contents of the letter of credit.
Export stocking: According to the requirements of the contract and the letter of credit, arrange production, purchase raw materials and packaging, and prepare the goods.
Chartering and booking: Contact the freight forwarder to make a booking and arrange the transportation of goods.
Export inspection: Apply to the quality inspection department for export commodity inspection and provide relevant documents.
Apply for a write-off slip: apply for a write-off slip from the foreign exchange management department for subsequent foreign exchange write-off.
Export declaration: Declare exports to the customs and provide documents such as power of attorney for customs declaration, customs declaration form for export goods, commercial invoice, packing list, etc.

