T6CP series Parker Denison Vane Pump
Single pump:T6C、T6D、T6E、T6CM、T6CP、T7B、T7BS、T7D、T7DS、T7E、T7ES
Double pump:T6CC、T6DC、T6EC、T6ED、T6EE、T7BB、T7BBS、T7DB、T7DBS、T7EB、T7EBS、T67CB、T67DB、T67EB、T67DBS
Triple pump:T6DCC、T6EDC、T6ECC、T6EDCC、T7DBB、T7DBSB、T7EBB、T7EBSB、T67EDB、T67EDBS、T67DCB、T67DDBS
| Contact us |
| Whats app: +86 13728707767 |
| E-mail: hyd-sales2009@outlook.com |
1. General Basic Parameters of T6CP Series
-
Structure Type: Single-stage high-pressure vane pump (pin-type vane structure)
-
Continuous Working Pressure: 280bar
-
Intermittent Peak Pressure: 320bar
-
Speed Range: Minimum 600rpm, Maximum 3200rpm, Rated speed 1200rpm
-
Compatible Media: Mineral oil, HF-0/HF-2 fire-resistant hydraulic oil, standard working condition with 24cSt viscosity
-
Rotation Direction: R (Clockwise), L (Counterclockwise)
-
Performance Advantages: Stable high-pressure output, low leakage, long service life, excellent adaptability to high and low temperature working conditions
2. Detailed Specification Parameter Table of 50 T6CP Series Models
|
No.
|
Pump Model
|
Theoretical Displacement (ml/rev)
|
Rated Flow @1200rpm (L/min)
|
Peak Input Power @320bar (kW)
|
Max Speed (rpm)
|
Continuous Pressure (bar)
|
Intermittent Pressure (bar)
|
Pump Weight (kg)
|
|
1
|
T6CP-003-1R00-C100
|
10.8
|
11.5
|
4.4
|
3200
|
280
|
320
|
15.7
|
|
2
|
T6CP-003-1L00-C100
|
10.8
|
11.5
|
4.4
|
3200
|
280
|
320
|
15.7
|
|
3
|
T6CP-005-1R00-C100
|
17.2
|
16.5
|
11.5
|
3200
|
280
|
320
|
15.7
|
|
4
|
T6CP-005-1L00-C100
|
17.2
|
16.5
|
11.5
|
3200
|
280
|
320
|
15.7
|
|
5
|
T6CP-006-1R00-C100
|
21.3
|
20.6
|
13.8
|
3200
|
280
|
320
|
15.7
|
|
6
|
T6CP-006-1L00-C100
|
21.3
|
20.6
|
13.8
|
3200
|
280
|
320
|
15.7
|
|
7
|
T6CP-008-1R00-C100
|
26.4
|
26.7
|
16.6
|
3200
|
280
|
320
|
15.7
|
|
8
|
T6CP-008-1L00-C100
|
26.4
|
26.7
|
16.6
|
3200
|
280
|
320
|
15.7
|
|
9
|
T6CP-010-1R00-C100
|
34.1
|
31.8
|
20.9
|
3200
|
280
|
320
|
15.7
|
|
10
|
T6CP-010-1L00-C100
|
34.1
|
31.8
|
20.9
|
3200
|
280
|
320
|
15.7
|
|
11
|
T6CP-012-1R00-C100
|
37.1
|
35.4
|
22.6
|
3200
|
280
|
320
|
15.7
|
|
12
|
T6CP-012-1L00-C100
|
37.1
|
35.4
|
22.6
|
3200
|
280
|
320
|
15.7
|
|
13
|
T6CP-014-1R00-C100
|
46.0
|
46.1
|
27.6
|
3200
|
280
|
320
|
15.7
|
|
14
|
T6CP-014-1L00-C100
|
46.0
|
46.1
|
27.6
|
3200
|
280
|
320
|
15.7
|
|
15
|
T6CP-017-1R00-C100
|
58.3
|
60.9
|
34.5
|
3200
|
280
|
320
|
16.2
|
|
16
|
T6CP-017-1L00-C100
|
58.3
|
60.9
|
34.5
|
3200
|
280
|
320
|
16.2
|
|
17
|
T6CP-020-1R00-C100
|
63.8
|
67.5
|
37.6
|
3200
|
280
|
320
|
16.2
|
|
18
|
T6CP-020-1L00-C100
|
63.8
|
67.5
|
37.6
|
3200
|
280
|
320
|
16.2
|
|
19
|
T6CP-022-1R00-C100
|
70.3
|
75.3
|
41.2
|
3200
|
280
|
320
|
16.8
|
|
20
|
T6CP-022-1L00-C100
|
70.3
|
75.3
|
41.2
|
3200
|
280
|
320
|
16.8
|
|
21
|
T6CP-025-1R00-C100
|
79.3
|
86.1
|
46.3
|
3200
|
280
|
320
|
16.8
|
|
22
|
T6CP-025-1L00-C100
|
79.3
|
86.1
|
46.3
|
3200
|
280
|
320
|
16.8
|
|
23
|
T6CP-028-1R00-C100
|
88.8
|
99.1
|
38.9
|
3000
|
280
|
320
|
17.5
|
|
24
|
T6CP-028-1L00-C100
|
88.8
|
99.1
|
38.9
|
3000
|
280
|
320
|
17.5
|
|
25
|
T6CP-031-1R00-C100
|
100.0
|
112.5
|
43.6
|
3000
|
280
|
320
|
17.5
|
|
26
|
T6CP-031-1L00-C100
|
100.0
|
112.5
|
43.6
|
3000
|
280
|
320
|
17.5
|
|
27
|
T6CP-003-1R01-C100
|
10.8
|
11.5
|
4.4
|
3200
|
280
|
320
|
15.7
|
|
28
|
T6CP-005-1R01-C100
|
17.2
|
16.5
|
11.5
|
3200
|
280
|
320
|
15.7
|
|
29
|
T6CP-006-1R01-C100
|
21.3
|
20.6
|
13.8
|
3200
|
280
|
320
|
15.7
|
|
30
|
T6CP-008-1R01-C100
|
26.4
|
26.7
|
16.6
|
3200
|
280
|
320
|
15.7
|
|
31
|
T6CP-010-1R01-C100
|
34.1
|
31.8
|
20.9
|
3200
|
280
|
320
|
15.7
|

Process steps:
Customer inquiry: Customers will make inquiries before placing an order to understand product details and communication needs.
Quotation: According to customer needs, provide a formal quotation, including the name, model, quantity, delivery time, payment method, etc. of the goods.
Order confirmation: After the customer confirms the quotation, a formal purchase order will be placed.
Confirm the delivery time: communicate the delivery time with the production department, inform the factory of the order details, and arrange the production plan.
Sign an export contract: After the two parties confirm that it is correct, sign an export contract to establish a trade relationship.
Implement the letter of credit (if applicable): If the payment method of the letter of credit is used, the customer needs to be urged to issue the certificate and review the contents of the letter of credit.
Export stocking: According to the requirements of the contract and the letter of credit, arrange production, purchase raw materials and packaging, and prepare the goods.
Chartering and booking: Contact the freight forwarder to make a booking and arrange the transportation of goods.
Export inspection: Apply to the quality inspection department for export commodity inspection and provide relevant documents.
Apply for a write-off slip: apply for a write-off slip from the foreign exchange management department for subsequent foreign exchange write-off.
Export declaration: Declare exports to the customs and provide documents such as power of attorney for customs declaration, customs declaration form for export goods, commercial invoice, packing list, etc.
