VDC-1A-1A2,VDC-1B-1A2 Vane pump
VDC Series:VDC-1A/B; VDC-2A/B; VDC-3A/B
Whats app: +86 13728707767
E-mail: hyd-sales2009@outlook.com
We are a professional manufacturer of hydraulic pumps, offering a complete range of products. Inquiries are welcome! (#^.^#)
Nachi VDC-1A-1A2 & VDC-1B-1A2 Vane Pump Specifications
General Specifications (VDC-1A-1A2 & VDC-1B-1A2)
|
Parameter Name
|
VDC-1A-1A2
|
VDC-1B-1A2
|
Unit
|
|---|---|---|---|
|
Displacement
|
16.7
|
16.7
|
cm³/rev
|
|
No-Load Discharge Rate (1000 min⁻¹)
|
16.7
|
16.7
|
ℓ/min
|
|
No-Load Discharge Rate (1200 min⁻¹)
|
20
|
20
|
ℓ/min
|
|
No-Load Discharge Rate (1500 min⁻¹)
|
25
|
25
|
ℓ/min
|
|
No-Load Discharge Rate (1800 min⁻¹)
|
30
|
30
|
ℓ/min
|
|
Pressure Adjustment Range
|
7 – 14 (71.4 – 143 kgf/cm²)
|
7 – 14 (71.4 – 143 kgf/cm²)
|
MPa
|
|
Allowable Peak Pressure
|
14 (143 kgf/cm²)
|
14 (143 kgf/cm²)
|
MPa
|
|
Minimum Revolution Speed
|
800
|
800
|
min⁻¹ (rpm)
|
|
Maximum Revolution Speed
|
1800
|
1800
|
min⁻¹ (rpm)
|
|
Weight
|
9.5
|
9.5
|
kg
|
|
Mounting Type
|
Flange Mounting (Optional Foot Mounting)
|
Flange Mounting (Optional Foot Mounting)
|
–
|
|
Operating Fluid
|
ISO VG 32 – 68 (Viscosity Index ≥ 90)
|
ISO VG 32 – 68 (Viscosity Index ≥ 90)
|
–
|
|
Rotation Direction
|
Clockwise (Viewed from Shaft Side)
|
Clockwise (Viewed from Shaft Side)
|
–
|
Key Performance Features
-
High-Efficiency & Stable High-Pressure Operation: Equipped with innovative pressure control, pressure balance mechanisms, and an original 3-point ring support system, ensuring excellent performance at high pressures up to 14 MPa.
-
Low Vibration & Noise: Adopts advanced mechanisms, including 3-point support for control piston and bias piston, minimizing ring vibration and achieving quiet operation适合 industrial environments requiring low noise levels.
-
Precise & Stable Discharge Rate: A revolutionary pressure compensator-type pressure control mechanism maintains a highly stable fixed discharge rate even in the high-pressure range.
-
High Efficiency with Minimal Power Loss: New mechanical innovations reduce power loss, especially during full cutoff, improving energy efficiency and reducing operating costs.
-
Easy Maintenance & Handling: Pressure adjusting and discharge rate adjusting mechanisms are located on the same side of the pump, simplifying maintenance and daily operation.
-
Outstanding Response: An innovative ring stopper eliminates excessive ring displacement, ensuring high-precision operation during starts, stops, and load changes.
Application Scope
Notes
-
The operating fluid must meet ISO VG 32-68 standards with a viscosity index of 90 or higher to ensure pump performance and service life.
-
Do not exceed the maximum revolution speed (1800 rpm) or allowable peak pressure (14 MPa) to avoid damage to the pump.
-
Regular maintenance is recommended to check the pump’s pressure, discharge rate, and fluid quality, ensuring stable operation.
-
When starting the motor under specific conditions

VDC series Nachi vane pump
Process steps:
Customer inquiry: Customers will make inquiries before placing an order to understand product details and communication needs.
Quotation: According to customer needs, provide a formal quotation, including the name, model, quantity, delivery time, payment method, etc. of the goods.
Order confirmation: After the customer confirms the quotation, a formal purchase order will be placed.
Confirm the delivery time: communicate the delivery time with the production department, inform the factory of the order details, and arrange the production plan.
Sign an export contract: After the two parties confirm that it is correct, sign an export contract to establish a trade relationship.
Implement the letter of credit (if applicable): If the payment method of the letter of credit is used, the customer needs to be urged to issue the certificate and review the contents of the letter of credit.
Export stocking: According to the requirements of the contract and the letter of credit, arrange production, purchase raw materials and packaging, and prepare the goods.
Chartering and booking: Contact the freight forwarder to make a booking and arrange the transportation of goods.
Export inspection: Apply to the quality inspection department for export commodity inspection and provide relevant documents.
Apply for a write-off slip: apply for a write-off slip from the foreign exchange management department for subsequent foreign exchange write-off.
Export declaration: Declare exports to the customs and provide documents such as power of attorney for customs declaration, customs declaration form for export goods, commercial invoice, packing list, etc.
