Home » Product » KP40.160、 KP40.180 series gear pump

KP40.160、 KP40.180 series gear pump

KP20 series gear pump:  rated displacement is 25 cm3/rev 。
KP30 series gear pump:  displacement range is 3.40-23.37 cm3/rev 。
KP40 series gear pump:  displacement up to 40 cm3/rev 。
         E-mail:  hyd-sales2009@outlook.com

Description

Casappa KP series gear pump:

KP20 series KP20.11.2 KP20.14 KP20.16 KP20.20 KP20.25 KP20.31.5 KP20.4 KP20.6.3 KP20.8
KP30 series KP30.27 KP30.34 KP30.38 KP30.43 KP30.51 KP30.56 KP30.61 KP30.73
KP35 series KP35.100 KP35.63 KP35.71 KP35.80 KP35.90
KP40 series KP40.100 KP40.109 KP40.121 KP40.133 KP40.151 KP40.160 KP40.180 KP40.63 KP40.73 KP40.87

-**Technical parameters**
-**Displacement**: The displacement of KP40.160 series gear pumps is 160.77cm3/rev, and the displacement of KP40.180 series gear pumps is 180.73 cm3/Rev.
-**Pressure**: The maximum continuous pressure of KP40.160 series gear pumps is 270bar, and the maximum continuous pressure of KP40.180 series gear pumps is 250bar.According to the characteristics of the Kappa 40 Plus series, its peak pressure can reach 330bar.
-**Speed**: The maximum speed of the KP40.160 series gear pump is 2500r/min, and the maximum speed of the KP40.180 series gear pump is 2200r/min.

-**Structural characteristics**
-The gear pump is made of two-piece cast iron, with a sturdy and compact structure, which can realize a variety of functions in a limited space.
-Mounting flanges that meet SAE and European standards, as well as ports on the side or back, can be provided to facilitate users to install according to actual needs.

-**Performance advantage**
-It has high operating pressure, can work stably in a high pressure environment, and is suitable for various heavy-duty working conditions.
-High efficiency can be maintained at high temperatures, energy loss can be reduced, and the working efficiency of the system can be improved.
-The use of advanced design and manufacturing technology, low noise during operation, can provide a quieter working environment.
-It has a long expected working life, high reliability, and can reduce maintenance and replacement costs..

Shipping & Delivery

Process steps:
Customer inquiry: Customers will make inquiries before placing an order to understand product details and communication needs.
Quotation: According to customer needs, provide a formal quotation, including the name, model, quantity, delivery time, payment method, etc. of the goods.
Order confirmation: After the customer confirms the quotation, a formal purchase order will be placed.
Confirm the delivery time: communicate the delivery time with the production department, inform the factory of the order details, and arrange the production plan.
Sign an export contract: After the two parties confirm that it is correct, sign an export contract to establish a trade relationship.
Implement the letter of credit (if applicable): If the payment method of the letter of credit is used, the customer needs to be urged to issue the certificate and review the contents of the letter of credit.
Export stocking: According to the requirements of the contract and the letter of credit, arrange production, purchase raw materials and packaging, and prepare the goods.
Chartering and booking: Contact the freight forwarder to make a booking and arrange the transportation of goods.
Export inspection: Apply to the quality inspection department for export commodity inspection and provide relevant documents.
Apply for a write-off slip: apply for a write-off slip from the foreign exchange management department for subsequent foreign exchange write-off.
Export declaration: Declare exports to the customs and provide documents such as power of attorney for customs declaration, customs declaration form for export goods, commercial invoice, packing list, etc.